Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

OFFICIAL NOTICE NO. 79 - 2022 Project No. 1 Time for Completion: All work on ST212140109, ST212210103, ST212210104, ST214220101 shall be completed by October 31, 2022. No work on ST221210313: Westside Academy - 2 intersections: North 31 st Street and West Brown Street & North 32 nd Street and West Lisbon Avenue, may begin until the Contractor has been given approval by the Chief Construction Engineer, Mr. Anthony Kotecki. The Contractor will need to contact Mr. Anthony Kotecki at (414) 708-3886, as soon as the contract is awarded. Work on ST221210313 may take place in 2023. There will be no extra costs given for any work needed to be done in 2023. Liquidated Damages, per diem: $1000.00/Day The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233. Located at the following Alley(s) Bounded By (ABB) & Intersections: ST212140109 - ABB: West Becher Street, West Rogers Street, South 35 th Street, to South 36 th Street ST212210103 - ABB: West Hope Avenue, West Marion Street, North 62 nd Street, to North 63 rd Street ST212210104 - ABB: West Euclid Avenue, West Ohio Avenue, South 12 th Street, to South 13th Street ST214220101 - ABB: West McKinley Avenue, West Vliet Street, North 20 th Street to North 21 st Street ST221210313 - West Side Academy - 2 Intersections: North 31 st Street and West Brown street & North 32 nd Street and West Lisbon Avenue (SRTS) The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. The apprenticeship requirements for this project is: 0. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. PROJECT 814-1109 PROJECT/GRANT ST212140109 ESTIMATE 29315 Alley betw. W. Becher St., W. Rogers St., S. 35th St., S. 36th St. (Permeable alley) PROJECT - PROJECT/GRANT ST221210313 ESTIMATE 30598 PROJECT 821-1103 PROJECT/GRANT ST212210103 ESTIMATE 30618 Alley betw. W. Hope Av., W. Marion St., N. 62nd St., N. 63rd St.(Permeable alley) PROJECT 821-0104 PROJECT/GRANT ST212210104 ESTIMATE 30619 Alley betw. W. Euclid Av., W. Ohio Av., S. 12th St., S. 13th St. (Permeable alley) PROJECT 814-2201 PROJECT/GRANT ST214220101 ESTIMATE 30731 PROJECT BREAKDOWN OFFICIAL NOTICE # 79-1 07/18/2022 09:16:55 AM West Side Academy - 6 intersections: N. 31st St. and N. 32nd St./W. Brown St., W. Vine St. and W. Lisbon Ave. (SRTS) Alley Betw. W. McKinley Av.(ext'd), W. Vliet St., N. 20th St., N. 21st St. (new alley for DCD)(Permeable alley)

Award

Roads / Highways

$971,737.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
120
Bidding Soon
1,189
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2022

September 2, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.