BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mosinee, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of June 28, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The pavement needs treatment to extend its service life. Perpetuation project of 11.99 miles of STH 153 between Stainless Avenue (in Stratford) and STH 107 in Marathon County. Improvements include a segment of pavement replacement (Stainless Avenue to concrete); joint, crack, and slab repairs (concrete section); and a mill and overlay (concrete to STH 107). Additional work includes culvert replacements, curb ramp upgrades, spot curb and gutter repairs, guardrail replacement, and possible shoulder widening from 4th Avenue to Karen Lane. Pedestrian accommodation improvements may include: new crosswalk at Legion Street, new sidewalk on north side of STH 153 from Legion Street to Monument Avenue, extending sidewalk on north side of STH 153 from STH 97 to Stainless Avenue, and extending sidewalk on south side of STH 153 from Legion Street to Tradition Street. Anticipated Construction Cost: $5,000,000-$5,999,999 Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Perpetuation - Pavement Replacement, Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Roads / Highways

$6,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
22
Bidding Soon
229
All Active Projects
93
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

img_map_placeholder

WI-153, Mosinee, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.