BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Hamilton, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project will consist of the following approximate quantities of work: 4440 Tons Superpave Bituminous Concrete Wearing Surface Layer, 1/2 " Maximum Aggregate Size ESAL Range A/B, 350 Tons Superpave Bituminous Concrete Leveling Layer, , 400 Tons Patching, 1" Maximum Aggregate Size; all other labor, material, equipment and work required or implied by the Contract Documents (Plans and Specifications). Prequalification of Bidders is not required. However, Bidders must meet the minimum requirements included in the Contract Documents. Attention of Bidders is called to the provisions of State law governing "General Contractors", as set forth in AL Code 34-8-1, et seq. (1975), and rules and regulations promulgated pursuant thereto. The City will not enter a contract with a non-resident corporation or entity which is not qualified under State law to do business in the State of Alabama. All Bidders shall possess all other licenses and/or permits required by applicable law, rule, or regulation of the performance of the work. Upon submission of proposal, Bidders must submit their Contractor's license number and a copy of said license. Any bid not containing a current license number shall be rejected. Each Bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks shall be made payable to the City of Hamilton for an amount not less than 5 percent of the Engineer's estimated cost of the project or of the total bid in the proposal. In no event shall the amount be more than $10,000.00. Bidder further agrees to pay as liquidated damages, the sum of $300.00 for each consecutive calendar day thereafter

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
50
Bidding Soon
510
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2022

September 12, 2022

img_map_placeholder

Multiple Locations, Hamilton, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.