BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Bangor, Maine. Contact the soliciting agency for additional information.

This work includes the removal, disposal, and replacement of the entire cross section of Cells 1-3, including Subsurface Flow (SSF) Filter Soil media, SSF Wetland Gravel Media, underdrain pipes, isolator rows, aeration pipes, cleanouts, and geotextiles. The inlet structure, intermediate structure, and the outlet structures shall be left in place and re-used. Maintenance of stormwater flows, erosion control, restoration of disturbed areas, and other incidentals are all to be included in the lump sum price. Depending on available budget, Bid Alternate 1 - Deicing Stormwater Treatment System Phase III, may also be awarded. Phase III would include the same scope of work as Phase II, but to be completed for Cell 4 of the subsurface flow gravel wetland system. See Section IX. Specifications for more details concerning both project phases. The work must be done in accordance with Attachment #1, which includes civil drawings and notes for this project, the following conditions, and must be completed by June 30, 2023. Any questions must be directed in writing to bids@bangormaine.gov no later than 4:30 PM, Friday, July 29, 2022. The City will issue a response on or before 4:30 PM, Wednesday, August 3, 2022. The response will be in the form of an addendum, which will be available on the City. Notifications will be sent out at the time of release of all addenda to the appropriate Registered Vendor List. It is the responsibility of the Bidder(s) to see that their bids have sufficient time to be received by the Purchasing Department before the submittal deadline. Any bid, portion of a bid, or unrequested bid revision received at the City of Bangor Purchasing Department after the time and date specified, will be returned to the Bidder unopened. The City of Bangor reserves the right to reject any and all bids, to waive any informalities or defects in bids or to accept a higher cost bid if it is deemed to be in the best interest of the City of Bangor. The City also reserves the right to negotiate with the successful Bidder.

Award

Water / Sewer

Public - City

Service, Maintenance and Supply

1

1

4

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
160
All Active Projects
51
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.