BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Fort Worth, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Construction project consists of the replacement of 1,290 linear feet of 8-inch water pipe, 1,223 linear feet of 8-inch sanitary sewer pipe by open cut, and 1,336 linear feet of 8-inch sanitary sewer pipe by other than open cut. The areas are: along Hulen Sreet. from Wilton Drive to Wheelock Drive along Altamesa Boulevard near Vega Drive, the intersection of North Wedgemont Circle and Winifred Drive at Misty Meadows Drive South between Santa Rita Drive and Holly Springs Drive. Proposed water improvements include the removal and replacement of one fire hydrant and 14 1-inch water services including permanent asphalt pavement repair. Proposed sanitary sewer improvements include the replacement of 11 4-inch sewer services, ten 4-inch sewer service reinstatements and 15 4-foot diameter sanitary sewer manholes including permanent asphalt and concrete pavement repairs. Proposed pavement improvements include a 2-inch minimum mill and overlay (MOL) of approximately 3,333square yards of asphalt pavement along with the removal and replacement of 1,060 linear feet of 6-inch concrete curb and gutter, 5,000 square feet of 4-inch sidewalk and 2,000 square feet of 6-inch concrete driveway. The major work will consist of the (approximate) following: UNIT 1: Water Improvements: 1,290 LF of 8-inch water pipe by open cut 14 EA 1-inch water services 833 SY of 2" surface milling (MOL) (50/50) 833 SY of 2" asphalt pavement Type D (MOL) (50/50) 1,290 LF of 5' wide asphalt pavement repair 250 LF of 6" concrete curb and gutter (50/50) 500 SF of 6-inch concrete driveway (50/50) UNIT 2: Sanitary Sewer Improvements: 1,263 LF of 8-inch sanitary sewer pipe by open cut 1,278 LF of 8-inch sanitary sewer pipe by pipe enlargement 15 EA 4-foot diameter sanitary sewer manholes 1 EA 4-foot diameter shallow manhole 11 EA 4-inch sewer services 10 EA 4-inch sewer service reinstatements (pipe enlargement) 833 SY of 2" surface milling (MOL) (50/50) 833 SY of 2" asphalt pavement Type D (MOL) (50/50) 1,303 LF of 5' wide asphalt pavement repair 250 LF of 6" concrete curb and gutter (50/50) 500 SF of 6-inch concrete driveway (50/50) UNIT 3: Paving Improvements: 1,667 SY of 2" surface milling (MOL) (50/50) 1,667 SY of 2" asphalt pavement Type D (MOL) (50/50) 500 LF of 6" Concrete Curb and Gutter (50/50) 1,000 SF of 6-inch concrete driveway (50/50) The City's Business Equity goal on this project is 15% of the total bid value of the contrac

Award

Water / Sewer

$1,797,081.00

Public - City

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
150
Bidding Soon
3,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2022

October 17, 2022

Project location map

Multiple Locations, Fort Worth, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.