BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in North Las Vegas, Nevada. Conceptual plans call for site work for a water / sewer project.

Presently the Camino Pump Station has three pumps which provide water to pressure zone 2330. Currently two of the pumps are capable of pumping 3000 GPM and the other 250 GPM. When the pump station was built, it was anticipated that an additional 3000 GPM pump would be necessary to meet future demands. For this reason, a concrete pad, electrical cabinet, conduit and piping were included in the project. Due to equipment reaching the end of its lifecycle, it is recommended that all pumps, valves and electrical components be replaced and the additional 3000 GPM pump installed. Furthermore, current water demands have made it necessary to run the existing pumps at maximum capacity at times. This situation may leave the system vulnerable in the event of a fire, mechanical failure or when maintenance is required. New equipment and the additional pump will provide system redundancy and additional flow capability providing a more stable and reliable water system for our customers. As of June 14, 2025, this project is included in the City of North Las Vegas Fiscal Year 2024-2029 and funding is allocated for construction in FY 2024-25. Design firm information has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
18
Bidding Soon
429
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2025

img_map_placeholder

West Ann Road & Camino Al Norte, North Las Vegas, NV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.