BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in West Caldwell, New Jersey. Completed plans call for site work for a water / sewer project.

The project base bid involves improvements to the drainage system in both the Distler Avenue neighborhood and along Forest Avenue by improving the positive conveyance of storm sewer flow. This project will include storm sewer cleaning, reduction of storm sewer intrusions, storm sewer spot repairs, resetting of offset pipes, and storm sewer replacement, as necessary. Due to the repairs and improvements, surface restoration, inlet repairs and inlet reconstruction will be required. Alternate Bid "A" includes replacement of reinforced concrete pipe (RCP) with high density polyethylene pipe (HDPE) due to long lead times of procuring RCP pipe. Alternate Bid "B" includes replacement of reinforced concrete pipe (RCP) at Location 2 (Distler Neighborhood) after cleaning and CCTV inspection. Alternate Bid "C" includes replacement of reinforced concrete pipe (RCP) at Location 2 (Distler Neighborhood) after cleaning and CCTV inspection with high density polyethylene pipe (HDPE) due to long lead times of procuring RCP pipe. Each proposal must be enclosed in a sealed envelope bearing the name and address of the bidder on the face of the envelope, and clearly marked with the name of the contract being bid. Bids must be submitted at the time and place above specified and will be opened and read immediately thereafter. Bids will be accepted by mail or in person at the time specified. No Proposal, either by mail or in person, will be accepted after the date and hour specified. In the case of mailed Proposals, the Township assumes no responsibility for bid proposals received after the date and time specified. Bids must be submitted on a standard form. Upon receipt of the Notice to Proceed, the successful bidder shall complete construction within sixty (60) calendar days. The Mayor and Council reserve the right to waive any informalities and reject any and all bids. Bidders shall comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq.

Award

Water / Sewer

$242,844.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
404
Active Projects
86
Bidding Soon
4,506
All Active Projects
1,917
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

September 8, 2022

img_map_placeholder

Multiple Locations, West Caldwell, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.