BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Jackson, Michigan. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Questions are submitted online No The work includes the following partial listing of items with approximate quantities: A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: BASE PROJECT 1. Fabrication and delivery of five new industrial control panels. Panels shown on contract drawings include the panels below. The BPPHPP and AWPP panels shall be fully installed and wired as shown under this contract. The other panels (PPP, RBPP and AEPP) shall be fully fabricated and delivered to Owner for installation by Others under a different contract. a. Blower/PEW/Power House Processor Panel (BPPHPP). b. Primary Processor Panel (PPP). c. Digester Processor Panel (DPP). d. Retention Basin Processor Panel (RBPP). e. Screen (Preliminary) Processor Panel (SPP). f. Aeration West Processor Panel (AWPP). g. Aeration East Processor Panel (AEPP). DUDUCTIBLE ALTERNATE OPTION 2. Fabrication and delivery of two additional new industrial control panels. Panels shown on contract drawings include the panels below. Panels (DPP and SPP) shall be fully fabricated and delivered to Owner for installation by Others under a different contract. a. Primary Processor Panel (DPP). b. Digester Processor Panel (SPP). 3. Demolition of existing PLC equipment as indicated on the Drawings. 4. Fabrication, delivery, and installation of a new network panel (NP-1) as indicated on the Drawings. 5. Procurement and delivery of SCADA computing hardware equipment and software through SCADA Hardware and SCADA Software Allowances. a. SCADA Hardware allowance will be as directed by Owner/Engineer and utilized to purchase SCADA Historian, OIC No.1, OIC No. 3, OIC No. 4, iPad No. 1, iPad No. 2 shown on Drawings. Engineer will issue contractor a complete bill-of-material (BOM) for contractor purchase and delivery to site. b. SCADA Software allowance will be utilized to purchase SCADA software as directed by Owner/Engineer. Engineer will issue contractor a complete bill-of-material (BOM) for contractor purchase and delivery to site. 6. Contractor shall manage the Control Room Furniture allowance. This includes coordinating the purchase and installation of new control room desks, cabinets, and other control room furniture items through a local commercial furniture dealer/installer. 7. Other work indicated in the Contract Documents. Any questions concerning contract documents or specifications will be addressed at this meeting. This will give companies contemplating submitting a bid a chance to examine the locations of the proposed service/goods and receive interpretations of the contract documents. The City of Jackson does not discriminate on the basis of race, religion or national origin, color, age, sex, height, weight, marital status, and physical or mental handicap as to: access, availability, employment, or participation in any of its programs and activities. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 25 % - Labor and Materials Bond 100 %

Bid Results

Water / Sewer

$662,980.00

Public - City

Renovation, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
206
Bidding Soon
2,704
All Active Projects
1,064
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 30, 2022

September 30, 2022

September 30, 2023

img_map_placeholder

2995 Lansing Ave, Jackson, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.