Published September 16, 2022 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Warsaw, Indiana. Completed plans call for site work for a water / sewer project.

A new submersible lift station, approximately 1,350 LFT of 4-inch HDPE force main; 2 new air release valves and structures; lift station piping and valves; coatings; electrical; controls; mechanical; and site work; the installation of approximately 1,100 LFT of new 8-inch PVC sanitary sewer pipe; the installation of 5 new sanitary sewer manholes, and all related dewatering, pavement repair and restoration. Includes one railroad crossing with jack and bore installation. Work shall be constructed under a Unit Price Contract. Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive. The Contractor to whom the work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion.

Award

Water / Sewer

$1,314,780.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
112
Bidding Soon
1,218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2022

October 18, 2022

Project location map

W 200 S, Warsaw, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.