BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2022 at 7:00 PM

Updated September 18, 2023

Site work for a water / sewer project in Sour Lake, Texas. Completed plans call for site work for a water / sewer project.

The project is generally described as drilling 800 feet of 8 3/4 " pilot bore, set of geophysical logs (one spontaneous potential, one gamma ray, one 4-point resistivity curve (8-inch, 16-inch, 32-inch, and 64-inch), one TDS-NaCl-Archie log) and up to three sampled intervals within discrete zones determined by the engineer. Sampled intervals will be explored with up to 20 feet of 6-inch perforated stainless-steel pipe set within a 15-inch, gravel packed bore as required in the contract documents.

Award

Water / Sewer

$246,800.00

Public - City

Site Work

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
136
Bidding Soon
2,993
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

November 11, 2022

Project location map

To Be Determined, Sour Lake, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.