BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Stanton, Texas. Completed plans call for the renovation of a 55,474-square-foot multi-residential development.

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: New kitchens and bathrooms for the scattered site units. Work to include patching and painting of drywall and doors. The units to receive new flooring, new light fixtures, new receptacles and switches along with new cover plates, and replacement of doors, under slab plumbing repairs, and termite damage repairs. The Contractor shall visit the site and acquaint themselves with all existing conditions as they affect the work specified. All questions concerning this project shall be referred to 1919 Architects 4000 Morsay Drive, Rockford, IL 61107, (815) 229-8222, attention Ron Billy or ron@1919architects.com New kitchens and bathrooms for the scattered site units. Work to include patching and painting of drywall and doors. The units to receive new flooring, new light fixtures, new receptacles and switches along with new cover plates, and replacement of doors, under slab plumbing repairs, and termite damage repairs. Bids received must be enclosed in a sealed envelope and clearly marked Scattered Site Units Rehab. Bid Bond executed by the bidder and acceptable sureties in an amount of not less than 5% of the base bid shall be submitted with each bid. Failure to submit an acceptable bid bond with the bid will result in the rejection of the bid. Attention is called to the provisions for Equal Employment Opportunity and payment of not less than the minimum salaries and wages set forth in the bid documents. All Contractors who are awarded construction related contracts must document Affirmative Action to ensure Equal Opportunity in Employment. This documentation is subject to review by the Regional Office of the Department of Labour. As a part of normal contract administration, Stanton Housing Authority is responsible for determining the Contractor's compliance with the Equal Employment Opportunity Clause and Affirmative Action Requirements as well as the Contractor's performance in executing those requirements. All MBE/DBE/WBE Contractors, Subcontractors and Suppliers are encouraged to participate on Stanton Housing Authority projects. Stanton Housing Authority reserves the right to accept or reject any and all bids and to waive any and all technicalities. No bid shall be withdrawn for a period of (90) calendar days subsequent to the opening of the bids without the written consent of Stanton Housing Authority.

Post-Bid

Multi-Residential

$696,484.00

Public - City

Renovation

30

15

32

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
1
Bidding Soon
153
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.