BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Birmingham, Alabama. Completed plans call for the renovation of a water / sewer project.

Install VFD's for Cooling Towers located at 1705 7th Avenue South, Birmingham, AL 35294 at which time they will be opened and read. Prime Contractors that are properly licensed for this type of work are required to prequalify in order to bid. For more information about the project and how to prequalify, please go to the UAB Facilities Bid Calendar at website. refer to the bid date above, and click on the specific project number. Applicants for Prequalification are strongly encouraged to submit applications at the earliest date possible following the first date of advertisement. UAB will review applications as submitted and notify applicants within two (2) working days of submission. Applications received after the date of the Pre-bid Conference may not be considered. Est. $650,000.00 to $900,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project is primarily to replace (5) existing obsolete Reduced Voltage Soft Start Starters (RVSS) with (5) New Variable Frequency Drives (VFD) and (5) New RVSS Bypass Units. This requires rebuilding the existing Square D Motor Control Center (MCC) and providing a new MCC since there is inadequate room to do all in the existing MCC. Along with installation, programming for the new VFD's and RVSS's will be required as well as integration into the SCADA System so that the Central Plant Personnel can see the data and control from the Control Room. There is also some additional Water level Control required as part of the Controls Portion of the work. Work will be performed while the plant is in operation. The rebuilding of the existing MCC will have to occur in months when the load on the Plant is minimal, i.e. October-March. All work shall be coordinated with UAB Central Plant Operations and UAB Project Management.

Award

Water / Sewer

$900,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
545
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

September 26, 2022

img_map_placeholder

1705 7th Ave S, Birmingham, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.