BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Hawthorne, California. Contact the soliciting agency for additional information.

The City of Hawthorne, California, is requesting Statements of Qualifications from qualified airport engineering firms for the completion of plans, specifications, and construction administration and observation necessary to complete various improvement projects as detailed below. The administration phase includes preparing FAA reports, assisting in grant preparation, and coordination with sponsor and FAA. The construction Administration includes project management, conduct pre-construction conference and prepare meeting minutes, weekly construction meetings, submittals, shop drawings, methods review, and record drawings. This construction administration cost also includes FAA weekly reports and project closeout reports. Construction observation includes all project observations during construction phase and creating a punch list. Quality Assurance should also be included in this Statement of Qualifications. The initial design project scope will be for the Airport Runway and Taxiway Lighting and Signage Replacement and Upgrade. The City reserves the right to cancel this request for qualifications without notice. The scope of the various project improvements are subject to federal grant assurances and jurisdiction, requiring interaction and coordination with the Federal Aviation Administration (FAA) Los Angeles Airports District Office. Parties submitting Statements of Qualifications shall be prepared to perform all work in accordance with FAA policies and guidelines. The final scope of work, schedule, and cost for services will be negotiated upon selection of the most qualified firm, and subject to the availability of federal grants. The final scope and fee for each of the three projects described below will be negotiated separately upon FAA concurrence with the projects and subject to availability of FAA and City funding. Once awarded, the contract term and price quote shall be valid for a period of five (5) years. Services requested include general consulting, engineering, surveying, geotechnical consulting and may include construction inspection/management services. The scope of work will include, but not be limited to, the following projects as listed in Hawthorne Municipal Airports five-year Airport Capital Improvement Plan: The method of Contractor Selection has not been Determined at this time.

Conceptual

Transportation Terminals

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
199
Bidding Soon
3,656
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

Project location map

12101 Crenshaw Blvd, Hawthorne, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.