EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2022 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Elizabeth, New Jersey. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work consists of the demolition and removal of existing storm sewers, installing new storm sewers and concrete ditch lining, emergency generator and miscellaneous electrical improvements at the South Second Street Pumping Station. The work is located between Geneva and South Second Street along Third Avenue, along South Second Street, west of Third Avenue intersection, along a section of Elizabeth River between South Second Street and South First Street, within the City of Elizabeth, and shall be completed within 300 calendar days of the Contractor's receipt of written Notice to Proceed. Each bid must be accompanied by a certified check, cashier check or surety bond of a corporation acceptable to the City and in the amount of ten percent (10%) of the total amount of the bid presented, but in no case in excess of $20,000.00. Each bidder must also submit with his bid a certificate from a responsible surety company stating that the said surety company will provide, in the event that he should be the successful bidder, a surety bond in the amount of one hundred percent (100%) of the contracted price and subject to such conditions as contained in the specifications. No bids will be received after the time and date specified, and no bids will be received by mail. Any award with respect to this matter is specifically contingent upon the availability of sufficient funds having been appropriated in the municipal budget. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27, N.J.S.A. 40A:11-21, N.J.S.A. 40A:11-22, N.J.S.A. 40A:11-23.1, N.J.S.A. 40A:11-23.2, P.L. 1999, Chapter 238, as well as the requirements of N.J.S.A. 52:25-24.2 of the State of New Jersey as amended. All bids shall include a commitment to the use of small, minority, women's and labor surplus area businesses and shall be in conformity with N.J.A.C. 7:22-3.17(a) or 7:22-6.17(a)(24) with a goal of not less than 10% participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SED's). The Contract is expected to be funded in part with the funds from the New Jersey Department of Environmental Protection and the New Jersey Environmental Infrastructure Trust. Neither the United States nor the State of New Jersey, the New Jersey Environmental Infrastructure Trust, nor any of their departments, agencies, or employees is, or will be, a party to the Contract or any lower tier contract or subcontract. The Contract or Subcontract is subject to the provisions of N.J.A.C. 7.22 3, 4, 5, 9 and 10. Attention of bidder is particularly called to the requirements of Chapter 2.92 (formerly Chapter 65) of the Code of City of Elizabeth as supplemented and amended which requires the submission of certain affidavits which shall be considered by the City, in its determination of the responsibility of the lowest bidder. The City specifically reserves the right to waive any bidding irregularities with regard to the bidding requirements and as determined to be immaterial. The award or rejection of a contract for the within project is subject to the time limitations set forth in N.J.S.A. 40:11-24 which requires the award of the contract within 60 days of the bid opening, except that the bids of any bidders who consent thereto may, at the request of the contracting unit, be held for consideration for such longer period as may be agreed. The successful bidder will be required to furnish the required bond and certificates of insurance and to execute the contract within ten (10) calendar days from the award of the contract. Construction must begin within ten (10) calendar days after written notice to do so shall have been given to the Contractor by the Director of Public Works, and shall be carried on regularly and uninterruptedly, at a rate to insure its full completion within the specified calendar days after such notice. If at the time of award of the contract, the successful bidder has one or more contracts for projects with the City or is subsequently awarded a contract for other projects with the City than it will be required to work concurrently on all projects without interruption or delays. Shipping charges are additional and variable depending upon the pick-up or delivery option selected by the purchaser. Bid documents cannot be obtained at the City of Elizabeth or at Mott MacDonald's office. City Council reserves the right to reject any or all bids or any part thereof, in accordance with applicable law.

Award

Water / Sewer

$2,559,975.00

Public - City

Renovation, Site Work

34

26

9

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Protection of Adjacent Construction, Execution, Application, Erection, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings, Metal Gratings, Decorative Metal
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Radiation Protection
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Sodding, Plants, Ground Covers, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations, Site Grounding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Hooks, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
569
Active Projects
304
Bidding Soon
5,235
All Active Projects
2,481
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

October 1, 2022

img_map_placeholder

S Second St, Elizabeth, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

South Second Street Stormwater Control Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.