BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2022 at 8:00 PM

Updated February 9, 2024

Site work for a water / sewer project in Huntsville, Alabama. Completed plans call for site work for a water / sewer project.

For North Lake Dredging. A cashier's check or bid bond payable to The University of Alabama in Huntsville in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Other sets for general contractors, and sets for subcontractors and dealers, may be obtained with the same deposit, which will NOT be refunded as above. General Contractor(s) requesting and receiving documents, who decide not to bid project, must provide MINIMUM seven (7) days notice prior to bid date, of none bid, for refund of deposit on plans, following their return. Bids must be submitted on proposal forms furnished by the Architect (Engineer) or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect (Engineer); the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Contractor and its subcontractors shall be responsible for complying with rules and regulations of the Sales, Use, and Business Tax Division of the Alabama Department of Revenue regarding certificates and other qualifications necessary to claim such exemption when making qualifying purchases from vendors. The Owner shall not consider claims for additional costs resultant of the contractor's, or its subcontractors', failure to comply with such rules and regulations. Alabama Immigration Law (Act 2011-535 and codified in state law as Title 31, Chapter 13 of the Code of Alabama 1975, amended by Act No. 2012-491) requires the University to require all Contractors to enroll in the E-Verify program and to provide documentation of enrollment in the E-Verify program with their contracts or agreements. This is applicable to all General Contractors and Subcontractors performing work on a University project. Nonresident bidders must accompany any written bid documents with a written opinion of an attorney at law licensed to practice law in such nonresident bidder's state of domicile, as to the preferences, if any or none, granted by the law of that state to its own business entities whose principal places of business are in that state in the letting of any or all public contracts.

Post-Bid

Water / Sewer

$500,000.00

Public - State/Provincial

Site Work

11

14

11

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
35
Bidding Soon
704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 17, 2022

Project location map

To Be Determined, Huntsville, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.