Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2022 at 8:00 PM
Updated September 15, 2023
Site work for a civil project in Clemson, South Carolina. Completed plans call for site work for a water / sewer project.
Demolition, tree protection, erosion control, earthwork, utility relocation/realignment, site work, and stabilization for the construction of a permanent wet stormwater retention pond in the existing "Suber Dam" area of Clemson University as specified by sheets C-100 through S-6 of the drawings. Construction clock will start on the proposed Date of Commencement, March 1, 2023, but materials may be procured any time after Notice to Proceed has been posted. Construction Cost Range: $900,000 to $1,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$1,289,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
