BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a civil project in Clemson, South Carolina. Completed plans call for site work for a water / sewer project.

Demolition, tree protection, erosion control, earthwork, utility relocation/realignment, site work, and stabilization for the construction of a permanent wet stormwater retention pond in the existing "Suber Dam" area of Clemson University as specified by sheets C-100 through S-6 of the drawings. Construction clock will start on the proposed Date of Commencement, March 1, 2023, but materials may be procured any time after Notice to Proceed has been posted. Construction Cost Range: $900,000 to $1,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$1,289,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
76
Bidding Soon
1,267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

March 1, 2023

Project location map

Multiple Locations, Clemson, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.