Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 18, 2022 at 8:00 PM
Updated January 26, 2024
Demolition and site work for a residential development in Fayetteville, North Carolina. Completed plans call for the demolition of a residential development; and for site work for a residential development.
Bid price and scope of work required shall include the following as: -Contractor shall obtain at his/her expense all required, permits, licenses, bonds, insurance, reports, designs, engineering and/or inspections (If applicable). -Removal of all rubbish, trash and debris, tall weeds, tall grass and undergrowth from the entire site including cut limbs, logs, downed trees, climbing overgrowth (vines), organic debris piles. Remove all trees and shrubbery that is less than 3' in diameter and/or not purposely planted. Remove all rank growth. -Disposal of all debris at approved landfills or processing sites -Areas and dimensions are estimated based upon sampling reports and information supplied by 3rd parties -All work must be completed within 15 calendar days after notice to proceed has been issued. Contractor is responsible for contacting City prior to starting work and for inspection upon completion. -Contractor shall not assign, subcontract, or transfer any rights under or interest in (including, but without limitation, monies that may become due or monies that are due) the Agreement without the written consent of the City. -Contractor is responsible for providing clear copies of all demolition/lot cleaning related waste documents and landfill receipts. -Contractor is responsible for complying with all Local, State and Federal rules, codes, laws and legislation. The right is reserved to reject any or all bids and to waive all informalities concerning bid or award bid to the lowest, responsible bidder or bidders, taking into consideration quality, performance and the time specified in the proposals for the performance of the contract.
Bid Results
Residential Subdivision
$2,500.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 23, 2022
September 22, 2022
5329 Rodwell Rd, Fayetteville, NC
Related To This Project
Fayetteville, NC
Bid Date: Oct 18 2022
Fayetteville, NC
Bid Date: Sep 22 2022
Fayetteville, NC
Bid Date: Oct 20 2022
Fayetteville, NC
Bid Date: Sep 12 2022
Fayetteville, NC
Bid Date: Nov 03 2022
Fayetteville, NC
Bid Date: Oct 13 2022
Fayetteville, NC
Bid Date: Oct 11 2022
Fayetteville, NC
Bid Date: Nov 08 2022
Fayetteville, NC
Bid Date: Oct 21 2022
Fayetteville, NC
Bid Date: Oct 19 2022
Fayetteville, NC
Bid Date: Oct 20 2022
Raleigh, NC
Bid Date: Oct 31 2022
Greenville, NC
Bid Date: Nov 09 2022
Greensboro, NC
Bid Date: Nov 08 2022
Winston Salem, NC
Bid Date: Oct 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
