EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 21, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a bridge / tunnel in Carrollton, Mississippi. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge and Approaches CONTRACT TIME: 90 Working Days The attention of the BIDDER is directed to the State and Federal laws governing selection of and employment of labor. James A. Neill, Jr., President Carroll County Board of Supervisors Bidders are hereby notified that any proposal accompanied by letters qualifing in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award. PROJECT NO. LSBP-08(46) CARROLL COUNTY The Board of Supervisors hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Certified check or bid bond for five percent (5%) ofthe total bid, made payable to Carroll County and the State of Mississippi must accompany each proposal.

Bid Results

Bridges / Tunnels

$935,559.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles, Bored Piles
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
12
Bidding Soon
192
All Active Projects
84
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2022

September 29, 2022

img_map_placeholder

Multiple Locations, Carrollton, MS


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Bridge and Approaches

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.