BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Bellevue, Washington. Completed plans call for the renovation of a 4,680-square-foot multi-residential development.

Work includes but is not limited to: 1. Removal of asphalt shingles, underlayment, flashing, roof penetration flashing, vents, gutters, downspouts and all accessories. 2. Removal of all existing plywood decking. 3. Repair damaged or rotted roof framing. (See 1.13 Unit Cost.) 4. Replace damaged or rotted fascia board. (See 1.13 Unit Cost.) 5. Provide for owner representative to inspect all attic insulation prior to covering. 6. Install insulation baffles at all perimeter soffit locations to provide for proper attic ventilation. 7. Supply and installation: a. 5/8" Plywood decking throughout, assume replacement of all roof decking b. PVC Membrane Roofing System according to manufacturers specifications. (See Versicos Landmark PVC Specifications attached.) c. Roof penetration flashing d. PVC static air vents, 14 per building. e. Bath fan vents f. Fall arrest/restraint anchors g. Gutters and Downspouts h. Painting at fascia The Work shall be completed in 90 calendar days from the date of Notice to Proceed. Question deadline: 09/15/2022 at 09:00 a.m. A bid guarantee in the amount of 5% of the base bid amount is required. Failure of the bidder to provide bid guarantee shall render the bid non-responsive. Performance and Payment Bonds: as a Condition of Award Performance and Payment BondsFor 100% of the Contract Award Amount Shall Be Furnished for the Work. Acceptable forms of bid guarantee are: A bid bond or postal money order, or certified check or cashiers check made payable to King County Housing Authority. If you have questions, please contact MichelleJ@kcha.org . KCHA reserves the right to reject any or all bids or to waive any informality in the bidding. No bid shall be withdrawn for a period of 60 calendar days subsequent to the opening of the bids without the written consent of KCHA . Liquidated damages will be assessed for each calendar day that the Contractor exceeds the time for completion in the amount of $250. The Owner reserves the right to reject any or all bids or to waive any informalities or irregularities in the bidding . Liquidated Damages means the amount prescribed in the Contract Documents to be deducted from any payments due or to become due Contractor, for each days delay in completion of the Work beyond the time allowed in the Contract Documents as stated in the Notice to Proceed, plus any extensions of such time. Timely performance and completion of the Work is essential to Owner and time limits stated in the Contract Documents are of the essence. The liquidated damage amounts set forth will be assessed not as a penalty, but as liquidated damages for breach of the Contract Documents. This amount is fixed and agreed upon by and between the Contractor and Owner because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Owner would in such event sustain. This amount shall be construed as the actual amount of damages sustained by the Owner, and may be retained by the Owner and deducted from any payments to the Contractor. If the unpaid balance of the Contract Sum exceeds the cost of finishing the Work, including compensation for A/E services and expenses made necessary thereby and any other extra costs or damages incurred by Owner in completing the Work, or as a result of Contractor's actions, such excess shall be paid to Contractor. If such costs exceed the unpaid balance, Contractor shall pay the difference to Owner. Contractor shall also be liable for liquidated damages until such reasonable time as may be required for Completion. These obligations for payment shall survive termination. If different completion dates are specified in the contract for separate parts or stages of the work, the amount of liquidated damages shall be assessed on those parts or stages which are delayed. Liquidated Damages: Timely performance and completion of the Work is essential to Owner and time limits stated in the Contract Documents are of the essence. If Completion of the Work does not occur within the Contract Time, the Contractor agrees that Liquidated Damages in the amount of $250 per day will be assessed for each calendar day that the Contractor exceeds the time for completion

Award

Multi-Residential

$335,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
81
Bidding Soon
2,201
All Active Projects
669
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.