Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Greer, South Carolina. Completed plans call for the renovation of a transportation facility.
The Federal Aviation Administration (FAA) has a requirement for a phased boiler and chiller replacement at the Greenville-Spartanburg ATCT (GSP) in Greer, SC. Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in Beta.SAM are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS). This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR. A site visit is scheduled for September 08, 2022 at 1:00p.m.ET. To attend the site visit please submit your name, company, and contact information to Erin Crabtree at erin.m.crabtree@faa.gov no later than 12:00pmET on September 06, 2022. All questions regarding this SIR should be submitted in writing to Erin Crabtree at erin.m.crabtree@faa.gov. Questions are due no later than September 14, 2022 at 1700 ET. Proposals are due no later than October 07, 2022 at 1700 ET. Any proposal received after 1700 ET on October 07, 2022 will be considered non-responsive and deemed ineligible for award.All offers must be received electronically, via email to erin.m.crabtree@faa.gov. Hand delivered offers will not be accepted. To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website. The estimated Project Magnitude is between $250,000.00 and $500,000.00. Performance and Payment Bonds are required for this requirement.The contractor is required to submit a performance bond in a penal amount equal to 100 percent of the contract price, but for this contract the amount required by the Contracting Officer is 100%.The contractor is required to submit a payment bond in the penal amount of 100% within the time required by the Contracting Officer. To be eligible for award, the offeror must submit a proposal that is in accordance with Section L and Section M of this SIR. Phase I: Boiler Replacement Period of Performance is 90 days from issuance of NTP. Electronic & IT: 03 Phase II: Chiller Replacement Period of performance of 90 days will begin after completion of Phase I by separate issuance of NTP. Electronic & IT: 03 Goals for minority participation: 17.3% Goals for female participation: 6.9% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Transportation Terminals
$500,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2022
November 7, 2022
2000 GSP Dr, Greer, SC
Related To This Project
Greer, SC
--
Greer, SC
Bid Date: Nov 18 2022
Greer, SC
--
Greer, SC
--
Greer, SC
Bid Date: Dec 01 2022
Greer, SC
Bid Date: Dec 15 2022
Greer, SC
Bid Date: Dec 20 2022
Greer, SC
Bid Date: Sep 03 2019
Greer, SC
Bid Date: Oct 25 2022
Greer, SC
Bid Date: Oct 06 2022
Greenwood, SC
Bid Date: Nov 09 2022
Greenville, SC
Bid Date: Oct 21 2022
Charleston, SC
Bid Date: May 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.