Site work and paving for a mixed-use development in Clovis, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

This project involves rehabilitating AC pavement, reconstructing curb ramps, modifying traffic signals, installing loop detectors, adjusting manholes and valve boxes to finished grade, and restriping as needed on Villa Avenue. Liquidated Damages : 1,000 per Calendar Day The Work to be performed under this Contract as described below shall consist of furnishing all materials, equipment, supplies, labor and transportation, and performing all Work as required by and in strict accordance with the Contract Documents, all of which are made a part hereof. The Work shall be complete, including all Work, material, and services not expressly called for or shown in said Contract Documents, which may be necessary for completion and proper construction to carry out the Contract in good faith. The site of Work shall be left in a neat condition. The cost of all Work performed, furnished, and installed is to be included in the amount bid for the various items of Work with no separate compensation allowed therefore. The project includes furnishing all labor, materials, services and equipment; performing all work necessary as specified for, but not limited to, street rehabilitation along an existing 4-lane arterial with bike lanes. The work includes pulverize in place full depth removal of AC pavement and replacing in areas of severe structural failure, adjusting utility boxes and manhole lids to grade, constructing ADA curb ramp improvements, installing detector loops and striping to match the existing of Villa Avenue. All Work shall be performed in accordance with the applicable portions of the City of Clovis 2020 Standard Specifications and 2020 Standard Drawings, or latest revision; the applicable portions of the State of California Department of Transportation (Caltrans) 2018 Standard Specifications and the Caltrans 2018 Standard Plans as specified herein. The scope of Work is outlined in the Contract Documents, including but not limited to the Plans and Contract Specifications. Note that all storm drain facilities shall be completed in accordance with the applicable portions of the Fresno Metropolitan Flood Control District (FMFCD) District Standard, dated April 1, 2011 or latest revision.

Award

Roads / Highways

$690,763.00

Public - City

Paving, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
16
Bidding Soon
392
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2022

September 15, 2022

img_map_placeholder

Villa Ave, Clovis, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.