BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fredericton, New Brunswick. Contact the soliciting agency for additional information.

The mandate will consist of carrying out a drilling campaign in the area of the current floating docks. The contract will require drilling from a barge. Eight (8) boreholes are required and will be numbered F-01 to F-08 (see figure). If a slope is noticed between the front and rear boreholes, the 2 additional boreholes F09 and F10 must be added, based on the rate on the schedule. Drillings F04 F06 and F07 will have to reach a depth of 2 m in bedrock. If the rock is of poor quality (very fractured - RQD less than 30%), it will be necessary to extend the drilling until an RQD of 50% is obtained, for a maximum of an additional 1.5 m, and promptly notify the Departmental Representative. All field work shall be directly supervised by an intermediate geotechnical engineer. 1.2Context of survey The Department of Fisheries and Oceans plans to build a wharf in the area of the current gangway. The following options are being considered: 1- Wooden crib dock with a dimension of approximately 13m X 30m +-; 2- Wharf with Berlin wall facade; 3- Wharf on piles with rock sockets Option 1 - It is known that the rock in the area has a significant slope based on the plans of the existing structures and the surrounding topography. It is therefore important that the boreholes provide information on the slope of bedrock and that the study presents recommendations in relation to the stability of a timber crib and the bearing capacity of the soil in place and the anticipated settlements, if applicable. Recommendations are also expected on the suitability of the soils in place to withstand loads of a gravity structure, or if the ground must be excavated before setting up the cribs. Option 2 - It is also required to provide recommendations related to the construction of a Berlin wall wharf. This study should therefore include rock sampling to determine the parameters required to design rock sockets. Recognized references of two (2) calculation methods must be proposed which include the resistance of shear forces and moments at the base of the piles. The calculation methods must be presented in the report. It is also requested to provide a calculation method and the recommended parameters for the design of rock anchors to take up the lateral thrust of the soil. For parameters and calculations, include clear explanations related to safety factors and weighting. Finally, include an procedure with testing procedure that will be applied on site during the implementation of the works. This procedure will be included in the contractual documents and will allow quality control to be carried out during construction of sockets and tie rods. The calculation methods must be determined and accepted by the Departmental Representative, prior to the field work. Option 3 - For the option with piles, the parameters and recommendations must also be provided for the calculation of sockets in bedrock for the bearing of lateral and tensile loads. As for option 2, references of two (2) calculation methods must be provided. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
89
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

img_map_placeholder

To Be Determined, Fredericton, NB

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.