BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a mixed-use development in Plainwell, Michigan. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for site work for a educational facility; and swimming pool.

Plainwell Community Schools will receive proposals from qualified contractors for the Middle School Pool & Gym Addition Project. Bids due August 30, 2022: Proposals for Sitework and Concrete Bids due November 3, 2022: Landscaping, Precast Concrete, Masonry and Structural steel All proposals must be sealed in envelopes, plainly labeled "Proposal for Plainwell Community Schools - Middle School Pool & Gym Addition, Bid Division Any questions or RFI's should be submitted in writing to David Beckering; email: djb@beckering.com All proposals shall be accompanied by a sworn and notarized statement disclosing any familial relationship between the bidder and any employee of the School District or member of the Board of Education. Proposals that are not accompanied by this sworn and notarized statement of disclosure will not be accepted All proposals shall be accompanied by Affidavit of Compliance - Iran Economic Sanctions Act in compliance with "Iran linked business" within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012. Proposals that are not accompanied by this Affidavit of Compliance will not be accepted. A bid security in the amount of 5% of the bid in the form of a bid bond, certified or cashiers' check is required and payable to Plainwell Community Schools. Bid Results: Bid Division D: Landscaping Harder & Warner X X X X 72,598.00 Bid Division G: Precast Concrete Fabcon X X X X X 498,000.00 Bid Division H: Masonry Burggrabe Masonry X X X X X 3,704,993.00 Bid Division I: Structural Steel Van Dellen Steel X X X X X 2,397,000.00 Performance, labor and material bond costs (which cover 100% of the value of the project) should be bid separately on the line provided on the bid form. Do not include the cost of PLM Bonds in your base bid. Applicable Michigan sales and use tax apply to this project. The Owner reserves the right to accept or reject any or all bids and to waive any irregularities in proposals. Proposals shall remain firm for sixty (60) days from date of bid opening. Bid Result. Bid Division A: Sitework: Sitework Solutions $1,043,210.00 Bid Division E: Concrete: Burgess Concrete $2,366,369.00 g-1: community pool locker rooms: construct the additional building areas as delineated throughout the construction documents. a-1: pool balcony handrails: base bid is painted steel pickets to match running track. alternate is aluminum and glass railing system g-2: varsity locker room showers: construct additional shower stalls and the infrastructure necessary to support them a-2: mobile gymnasium bleachers: base bid will be no mobile bleachers. alternate will be adding the mobile bleacher sections intended for the east end of the basketball court. s-1: pool slab thickness: base bid is the 12" thick with 2 rebar mats, alternate is the 24" slab. g-3: middle school gym mechanical systems: replace existing ms gymnasium mechanical systems with new, including all necessary

Bid Results

Educational

$6,174,591.00

Public - City

Addition, Demolition, Site Work

249

42

294

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
95
Bidding Soon
1,358
All Active Projects
482
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 3, 2022

January 2, 2023

September 10, 2024

img_map_placeholder

684 Starr Rd, Plainwell, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.