Site work and new construction of a mixed-use development in Dallas, Texas. Conceptual plans call for the construction of a data center facility; and for site work for a data center facility.

SUBJECT* EHRM Infrastructure Upgrade Data Center (549-21-706) (VA-21-00060393) Dallas GENERAL INFORMATION CONTRACTING OFFICE'S ZIP CODE* 44131 SOLICITATION NUMBER* 36C77622R0102 RESPONSE DATE/TIME/ZONE 08-25-2022 2:00 PM EASTERN TIME, NEW YORK, USA ARCHIVE 99 DAYS AFTER THE RESPONSE DATE SET-ASIDE SDVOSBC PRODUCT SERVICE CODE* C215 NAICS CODE* 541310 PLACE OF PERFORMANCE VA North Texas Healthcare System (VHANTX) 4500 S. Lancaster Rd Dallas TX POSTAL CODE 75216 COUNTRY USA CONTACT INFORMATION CONTRACTING OFFICE ADDRESS Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 POINT OF CONTACT* Contract Specialist Shardae Webb shardae.webb@va.gov (216) 447-8300 x3358 ADDITIONAL INFORMATION AGENCY'S URL http://www.va.gov/ URL DESCRIPTION Department of Veterans Affairs Homepage AGENCY CONTACT'S EMAIL ADDRESS shardae.webb@va.gov EMAIL DESCRIPTION Office email DESCRIPTION PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330'S ARCHITECT-ENGINEER QUALIFICATION PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1. GENERAL INFORMATION: Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed-price design contract for Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, reports, and construction period services for Project # 549-21-706 "EHRM Data Center Design - Dallas, TX" project located at VA North Texas Healthcare System, Dallas (VHANTX) 4500 S. Lancaster Rd. Dallas, TX 75216. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation Part 36.6 "Architectural and Engineering Services" and VA Acquisition Regulation 836.6. In accordance with FAR 36.209 "Construction Contracts with Architect-Engineer Firms," no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). The NAICS Code for this procurement is 541310 "Engineering Services" and the annual small business size standard is $16.5M. This project requires a full design team to complete this project. The design must be complete and bid-ready no later than 210 calendar days after Notice of Award. In accordance with VAAR 836.204, the magnitude of construction of this project is to be between $10,000,000.00 and $20,000.000.00. A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to build a Data Center to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The project shall include, but is not limited to, design of a new Data Center at the specified location adhering to the EHRM guidelines outlined in attachments, providing fiber runs to the newly built demarcation room from the provider point, and verify and provide a redundant fiber run throughout the facility to each IT closet if required. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor's as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award. The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of VA North Texas Healthcare System, Dallas (VHANTX) record drawings and the EHRM infrastructure readiness assessment documents will be made available to the highest rated A/E firm; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design. 3. A-E SELECTION PROCESS: Firms submitting SF 330's in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for evaluation. The selection will be made as follows: SF 330s will be evaluated in accordance with the primary selection criteria as stated in this presolicitation notice. These evaluations will determine the most highly qualified firms for this particular requirement. In accordance with FAR 36.602-3-(c), at least three (3) of the most highly qualified firms will then be notified of the Government's intent to hold discussions. All firms not invited to participate in discussions will be notified at this time. Discussions will be held with the most highly qualified firms in the form determined to be most advantageous and economical by the contracting officer. This may include in writing, via phone interview, or in-person interview presentations. However, the form of discussions will be the same for all firms. The firms invited to participate in discussions will be notified by email and provided further instructions, to include any questions or topics to address. Following the completion of discussions, the firms will be evaluated and ranked for selection based on the primary and secondary selection criteria (if necessary), and the most highly qualified firm will be selected and subsequently sent the solicitation. The final evaluation and ranking will consider the SF330 submission for each firm, as well as additional information obtained via discussions. A site visit will be authorized for the highest rated firm during the negotiation process. An award will be made as long as the negotiation of rates and hours leads to a fair and reasonable determination of the final contract price. If negotiations are not successful with the highest rated firm, the firm will be notified that negotiations have been terminated. Negotiations will then be initiated with the next highest rated firm, and so on until an award can be made. 4. PHASE I SF330 SELECTION CRITERIA: The following are listed in descending order of importance: Primary Selection Criteria: Professional Qualifications (section E): Professional Qualifications necessary for satisfactory performance of required service. The design firm and A-E on staff representing the project or signing drawings in each discipline must be licensed to practice in any one of the United States of America. Provide Professional License numbers and/or proof of Licensure. The evaluation shall consider the specific experience (minimum of five years) and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm as full time employees) of personnel proposed for assignment to the project, and their record of working together as a team when evaluating professional qualifications. The lead designer in each discipline must be registered but does not have to be registered in the particular state where the project is located. Key positions and disciplines required for this project include, but are not limited to: Architect (LEED certified), CADD Technician, Registered Communications Distribution Designer (RCDD), Estimator, Civil Engineer, Electrical Engineer, Environmental Engineer, Fire Protection Engineer, Industrial Hygienist, Mechanical Engineer, Plumbing, Project Manager, Quality Assurance, Structural Engineer, and Physical Security Specialists. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: "I [signatory authority] ___________________, [company] __________________, certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance with 48 CFR 852.219-10." The information provided in sections C through E of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Specialized experience (sections F and H) : Specialized experience and technical competence in the design and construction period services shall be provided for network infrastructure installation, renovations, or upgrades. Projects experience should include upgrading large scale (multi-building with multiple generational OIT systems) fiber optics, data cable, structured cabling, electrical distribution design, electrical upgrades, uninterruptable power systems (UPS), electrical bonding, building management systems/building automation systems (BMS/BAS), HVAC, IT room renovations/expansion/relocations, Data Centers/Server Rooms reconfiguration, and physical security upgrades, duct bank and direct boring operations. Other specialized experience includes experience in critical path scheduling, fire protection, construction infection control protocols, energy conservation, transition, and sustainable design practices. Include no more than six (6) Government and private experience projects similar in size, scope and complexity, and experience with the types of projects above. The evaluation will consider the management approach, coordination of disciplines and subcontractors, quality control procedures, prior experience of the prime firm and any key subcontractors working together on relevant projects and familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. The information provided in sections F and G of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Capacity (section H) : The evaluation will consider the firm s ability to meet the compressed schedule of the overall project, as well as the available capacity of key disciplines to perform the work in the required time. Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded by the VA during the previous 12 months and the full potential value of any current indefinite delivery contracts. Offeror shall clearly state their available capacity presenting workload percentages for the key disciplines and/or team members. Also, the offeror must provide the completion percentages and expected completion date for the VA projects awarded in the previous 12 months. The information for this factor shall be provided in Section H of the SF 330. Please ensure the capacity applies toward the team/personnel provided in the SF 330. Past Performance (Section H and additional pages not counted toward page limitation): Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. The past performance will be evaluated for all projects provided in section F to include a review of Contractor Performance Assessment Rating System (CPARS). The following information is required for all projects noted in section F: contract/task order number, project title, prime firm, start date, and completion date. Evaluations may also include additional performance related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Evaluations will consider superior performance ratings on recently completed projects as well as the reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Also, consider, as appropriate, the record of significant claims against the firm because of improper or incomplete architectural and engineering services. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member performing the work under this contract. The information for this factor shall be provided in Section H of the SF 330. If there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. *Completed PPQs should be incorporated into the SF330 directly. PPQs should not be submitted to VHA PCAC directly. The PPQs will be counted towards the page limitations for this submission. Knowledge of the locality (section H), Knowledge of the locality, to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, working with and local construction methods or local laws and regulations. The information for this factor shall be provided in Section H of the SF 330. The information for this factor shall be provided in Section H of the SF 330. Note that the intent of this factor is to showcase a firm s understanding of the site and locality, and not where the firm is located and how they would travel to the site. Information related to the firm's location, shall be provided in section H, under Secondary Selection Criteria Factor 1. Experience in construction period services (section H): Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, support of construction contract changes to include drafting statements of work and cost estimates, attendance at weekly conference calls, providing minutes of meetings between the AE, VA, and contractors, pre-final inspection site visits, generation of punch-list reports, and production of as-built documentation. The information for this factor shall be provided in Section H of the SF 330. Secondary Selection Criterion*: Geographic location. Location of the firm, as measured by the driving distance (miles) between the Offeror's principal business location and the VA North Texas Healthcare System (VHANTX). Determination of the mileage will be based on Google Maps (https://www.google.com/maps/dir/). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm's SF 330 submission. 5. PHASE II WRITTEN RESPONSE SELECTION CRITIERIA: In accordance with FAR 36.602-3(c), discussions will be conducted in the form of written responses. The short listed firms will be invited to present their written responses to predetermined questions via email to the A-E Technical Evaluation Board. The instructions for the written responses will be provided to the short listed firms only. Each short listed firm will be evaluated based on their responses to the evaluation criteria. The highest-ranked firm will be selected based on their ratings from the written responses. The previous ratings from the SF330 evaluations are not applicable during Phase II. Below are the evaluation factors for the written responses and are of equal importance. Proposed Management and Coordination Plan: Discuss confidence and approach to completing a project of this scale with an expedited period of performance. Explain quality control methods that will be used throughout each design phase and prior to each submission. Address construction period services quality control methods and plan used throughout the construction phase. Describe strategy for control of estimated cost and solutions for anticipated problems that impact cost. Discuss proposed design team and their specific strengths and experience that make them the best fit for this project. Approach to Project Challenges: Discuss approach to overcome physical obstacles considering the amount of site visits needed for this specific project (address both design phase site visits as well as CPS visits). Review the SOW and supporting attachments and provide what you see as challenges and recommendations for addressing each of these challenges. Simply restating the requirements (copying and pasting from the SOW) is not considered to be a sufficient response for this factor. Information about this project's challenges should provide specific examples and a plan on how each challenge will be dealt with. Proposed Approach to Design Development: Discuss plan to ensure specifications and drawings are well edited and complete, accurate, all inclusive, and in coordination with each other. Describe plans with this project to ensure VA requirements are kept current, and specified equipment will be TRM approved. Discuss ability, familiarization, or experience with VA design guides, design alerts and directives and their interpretations and application to this design. Discuss approach to evaluate existing site conditions and ensure new work will not conflict with existing work. D. Expectations for VA - A-E Collaboration: Discuss what expectations the A-E firm would have from the VA for this project. Describe strategy for collaboration meetings throughout each phase and their significance to the overall end-product. 5. SUBMISSION REQUIREMENTS: The below information contains the instructions and format that shall be followed for the submission of the SF 330, Statement of Qualifications: Submit ONE (1) SF 330, Statement of Qualifications, via email to the Contract Specialist shardae.webb@va.gov. This shall include SF 330 and any applicable attachments. All responses are due on or before Thursday, August 25, 2022, at 2:00 PM Eastern Standard Time. The subject line of the email shall read: "SF330 Dallas, TX EHRM Design" The SF 330 shall be submitted in one email and have a file size shall be no larger than 5 MB. No hard copies will be accepted. The subject line of the email shall read: "SF 330 Submission; 36C77622R0102 - EHRM Data Center Design - Dallas, TX" The submission must include the SF 330, Architect/Engineer Qualifications (form is available online at http://www.cfm.va.gov/contract/ae.asp). The page limitation of the SF 330 shall not exceed a total of FIFTY (50) pages. This includes title page, table of contents, and any other relevant information. Each page shall be in in Arial size 12 font, single spaced. Part II of the SF 330 and any Contractor Performance Assessment Rating System (CPARS) reports will not count as part of the page limitations. A PPQ from previous projects may be submitted for this project. If significant portions of a project have been completed since the previous PPQ was filled out, a new PPQ should be submitted to accurately assess the project. *Important Note: For this procurement, all PPQs should be completed by the evaluator and returned to the A-E firm. The submitting A-E firm must incorporate completed PPQs into the SF330 document. PPQs should not be submitted by the evaluator directly to VHA PCAC. All SF 330 submissions must include the following information either on the SF 330 or by accompanying document: 1) Cage Code; 2) Unique Entity ID; 3) Tax ID Number; 4) The E-mail address and Phone number of the Primary Point of Contact; 5) A copy of the firms Vet Biz Registry; 6) SAM UEID & 7) DUNS Number. All questions shall be submitted via email to Shardae.webb@va.gov no later than August 11, 2022, @2:00pm EST. The subject line of the email shall read: "Technical Questions; 36C77622R0102 - EHRM Data Center Design - Dallas, TX. Questions received after the deadline may not receive a response. NOTE: Only submissions from SDVOSB concerns will be acceptable for this project. In order for an SDVOSB to be considered as a proposed contractor, the firm must be verified and visible by VET Biz (www.vetbiz.gov) and registered in the System for Award Management (SAM) database (www.sam.gov) at time of submission of their qualifications. Failure of a proposed SDVOSB to be verified by the CVE at the time the SF-330 is submitted shall result in elimination from consideration as a proposed contractor. All Joint Ventures must be CVE verified at time of submission and submit agreements that comply with 13CFR 125.15 prior to contract award. SF 330 submissions received after the date and time specified will not be considered. Firms not providing all required information may not be evaluated. All information must be included in the SF 330 submission package. It is the offeror's responsibility to check the Contract Opportunities website at: sam.gov for any revisions to this announcement prior to submission of SF 330s. A.1 LIST OF ATTACHMENTS See attached document: Attachment 1 - SOW - EHRM Infrastructure Data Center. See attached document: Attachment 2 - Past Performance Questionnaire. See attached document: Attachment 3 - Design Alerts 1-8. See attached document: Attachment 4 - Sensitive Infrastructure Data Classification Memo. See attached document: Attachment 5 - EHRM Arch and Eng CPM Schedule Spec. See attached document: Attachment 6 - PG 18-15 AE Submission Reqts Vol C. See attached document: Attachment 7 - Seasonal Influenza with Vaccines. See attached document: Attachment 8 - VHA Directive 1061. See attached document: Attachment 9 - Bonham Campus Map. See attached document: Attachment 10 - XMATRIX. See attached document: Attachment 11 - NARA Records Management Language for Contracts. See attached document: Attachment 12 - Past Performance Questionnaire. End of Document The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Data Centers

$20,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
210
Bidding Soon
5,009
All Active Projects
1,988
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.