BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Red Wing, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reclamation & Repave all existing bituminous on road leading into and around Waste Campus. Some existing gravel areas to be graded and paved with some Concrete Valley Gutter construction. All work to be done on City property in the City of Red Wing, Minnesota. Red wing solid waste campus, 1873 bench st., red wing, mn 55066 The Contractor shall proceed diligently and agrees to complete the Project to the satisfaction and approval of the City's Authorized Representative on or before October 29, 2022

Award

Roads / Highways

$846,307.00

Public - City

Paving, Site Work

9

5

2

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
123
Bidding Soon
1,591
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2022

August 29, 2022

Project location map

1873 Bench St, Red Wing, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.