BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Wilmington, North Carolina. Completed plans call for the renovation of a water / sewer project.

This is a single prime contract. Pre-Bid Conference: A pre-bid conference will be held, and IS NOT mandatory. Bids must be received by Julia Faircloth, Procurement Manager, or designee in the IT Conference Room. The official time will be by the clock in the IT Conference Room at 235 Government Center Drive and no late bids will be accepted. The Bidders are responsible for allowing time for traffic and parking prior to delivering the bids to the IT Conference Room. It is the bidder's responsibility to ensure that the bids are received on time. Cape Fear Public Utility Authority cannot guarantee the accuracy of documents and information at the plan rooms. Official sets only available from Cape Fear Public Utility Authority. 1. Plan Rooms: View online. Carolina AGC and Hispanic Contractors Association of the Carolinas: View online. An official set of relevant bid documents will then be provided to prospective bidder via email. If you send an email to bids@cfpua.org and do not receive a response with two (2) business days, please call 910-332-6472 or 910-332-6589. Bids received from bidders who cannot prove registration at time bids are due will not be opened or considered. Section 00111 Advertisement for Bids CFPUA Page | 2 Rev. 06/02/16 Bid Bond: A deposit is required with the submission of the bid. When a deposit is required, the bidder must submit with the bid cash or a certified check, drawn on a bank or trust company authorized to do business in the State of North Carolina, payable to Cape Fear Public Utility Authority, in an amount at least equal to of the total amount of the bid, as a guarantee that a contract will be entered into and that satisfactory performance and payment bonds will be executed. In lieu of making the cash deposit above described, a satisfactory bid bond in the amount of five percent (5%) of the total bid, executed by a corporate surety licensed under the laws of the State of North Carolina to execute such bonds, shall be submitted with each bid, conditioned that the surety will upon demand forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. This deposit shall be retained if the successful bidder fails to execute the contract within ten (10) days after the award of the bid or fails to give satisfactory surety as required in North Carolina General Statutes Section 143-129. Affidavit and Certification of Non-Collusion, Non-Suspension and Non-Conviction: The Affidavit and Certificate of Non-Collusion, Non-Suspension and Non-Conviction provided with bid documents must be completely executed and submitted with bid. Each bidder must show evidence that it is licensed as a contractor under Chapter 87 of the North Carolina General Statutes. Bid Opening: Bids must be in by Tuesday, August 23, 2022 at 11:00 AM in the IT Conference Room, 2 nd Floor of 235 Government Center Drive. Bids must be received by Julia Faircloth, Procurement Manager, or designee in the IT Conference Room. The bidder must have the following NC General Contractor's license to be qualified to perform the work associated with this bid: Limitation: Unlimited Classification(s): Public Utility No bid may be withdrawn after bids have been opened, except as provided in the North Carolina General Statutes. If the bidder fails to complete and submit all requirements stated in this Advertisement for Bids and those further requirements stated in the Instruction to Bidders included with the relevant contract documents, the Cape Fear Public Utility Authority may deem such failure nonresponsive and therefore a forfeiture of the bid. Cape Fear Public Utility Authority reserves the right to reject any and all bids. All inquiries concerning this bid shall be directed to CFPUA Purchasing Division by e-mail to bids@cfpua.org. Engineer's Opinion of Probable Construction Cost: $1,694,000. - $1,980,000 DEADLINE FOR QUESTIONS: TUESDAY, AUGUST 16, 2022 AT 2:00PM

Award

Water / Sewer

$1,834,900.00

Public - City

Renovation

17

15

4

8

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
39
Bidding Soon
441
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

October 31, 2022

img_map_placeholder

1833 N 5th Ave, Wilmington, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.