EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a road / highway in Marshall, Texas. Completed plans call for site work for a road / highway.

For Ps&e Package Questions Call: Rebecca Wells 701 East Main St Atlanta, Tx 75551 903/799-1482 Etclength: 9.9580mi Etcdbe Goal: 0.0 % Time for Completion: 117 Working Days For Questions Regarding a Proposal Call 512/416-2498 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Harrison0096-07-052sl 281 Us 80stp 2023(025)hestom Brown Parkway Length: 5.5050 Miles Morris0222-03-0640.72 Mi E of Us 259 Sh 11stp 2023(025)hes3.47 Mi E of Us 259 Length: 2.7490 Miles Titus0248-09-0061.0 Mi S of Sh 49 Us 271stp 2023(025)hes1.0 Mi W of Bu 271 Length: 1.7040 Miles TXDOT - US 80 - Installing Median Barrier EST.COST: 2,191,041.61

Award

Roads / Highways

$1,862,982.00

Public - State/Provincial

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
12
Bidding Soon
368
All Active Projects
169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

November 7, 2022

img_map_placeholder

US-80, Marshall, TX

Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

US 80 - Installing Median Barrier

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.