BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Fallon, Nevada. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of October 24,2022, no bids were received, no information for rebid.** The Work generally includes but is not limited to: Roadway reconstruction of approximately 2,900 linear feet of West A Street and Taylor Street, various concrete improvements, such as, replacement of sidewalk, curb and gutter, residential and commercial driveway or approach improvements, and ADA compliant pedestrian ramps at the affected intersections, storm drain improvements include new catch basins and lateral tie-ins, minor striping, and traffic control. The Work will be substantially completed within 65 calendar days

Final Planning

Roads / Highways

$1,900,000.00

Public - City

Paving, Site Work

26

24

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
19
Bidding Soon
241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2022

April 24, 2023

Project location map

W A St & N Taylor St, Fallon, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.