BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Ridgefield, Connecticut. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://www.mrt.com/news/article/Ridgefield-to-construct-trail-along-Ligi-s-Way-17658913.php Ridgefield to build half-mile trail on Ligi's Way 'to develop the pedestrian network' in town RIDGEFIELD -- The town plans to soon begin building a trail along Ligi's Way with a goal to encourage walking, jogging and bird watching. The project includes the design and construction of about 2,510 feet of an 8-foot-wide walkway along Farmingville Road and Ligi's Way. "It will definitely be a big project for next year," Ridgefield First Selectman Rudy Marconi said. When completed, "it will provide a unique area to look out over the Great Swamp for bird watching," he said. "It's great to see us continue to develop the pedestrian network in Ridgefield," said Robert Hendrick, chairman of the town Planning & Zoning Commission. "That's one of the major goals of our Plan of Conservation and Development for the community -- to increase pedestrian opportunities in Ridgefield. This is a big step along that way." According to the project site plans, it will include a wooden boardwalk and a 60-foot prefabricated steel pedestrian bridge. The nearly half-mile walkway will begin at Danbury Road and Farmingville Road, then extend along Farmingville Road and Ligi's Way, and end at Ligi's Way and South Street. "You walk down Farmingville to the intersection of Ligi's Way, cross the street and walk the boardwalk the entire length of Ligi's Way," Marconi said. "Then you would walk in front of ROAR (Ridgefield Operation Animal Rescue), in front of the recycling area, in front of the fuel depot. In front of the Goodwill trailer -- there'll be a new sidewalk all along there -- and you'll go into the woods behind the Goodwill trailer." Ligi's Way, which was previously called Bypass Road, was renamed after Ridgefield Police Chief Richard Ligi, who died in 2008 at age 60. The area, which the town owns, is now all woods. The first step in the project will be to create the boardwalk, which will be about 1,600 feet long. "The proposed wooden boardwalk along Ligi Way is to minimize wetland disruption and keep all work within town of Ridgefield right-of-way. ... The continuation of this path under future phases will directly connect to the existing Rails-to-Trails walkway leading to the Branchville section of Ridgefield," the site plan says. When the project is done, the town will probably dedicate additional parking for it, Marconi said. Construction could also cause some traffic delays, he said. The project, which was initially expected to take place during the summer of 2021, was delayed due to a supply chain shortage. "During COVID, the price of lumber skyrocketed. We didn't have any bids so we had to rebid the project," said Marconi, adding that he doesn't yet know the cost of the project or the timeline. The funds will come from the Local Transportation Capital Improvement Program, which provides state funds to urbanized area municipal governments in lieu of federal funds otherwise available through federal transportation legislation. __________________ State Project No. L117-0001 Branchville TOD Pedestrian Improvements State Federal ProjectTerms and conditions as well as the description. Questions should be sent to Jacob Muller, Purchasing Director at purchasing@ridgefieldct.org. A pre-bid walk through will not be held, however, bidders are highly encouraged to visit the project site and familiarize themselves with the project area prior to submission of their bid. Each bidder will be required to submit to the Office of the Director of Purchasing, their original proposal with a bid bond or cashier's check in the amount of ten percent (10%) of the base bid. Each bidder shall honor the bid price for ninety (90) business days from the date of the bid opening, without modification. Upon award of the bid, the lowest responsible bidder shall be bound by the bid proposal price throughout the contract period. The minimum rates to be paid for labor on various classifications of the project shall be in accordance with the current schedule of prevailing wages established by the Federal Department of Labor (Davis-Bacon Act) and the Connecticut Department of Labor, Wage and Workplace Standards Division. Refer to the prevailing wage rates included within the specifications. The bidder agrees that 10% of the final contract value shall be performed by Disadvantaged Enterprise Enterprises (DBE) certified by the Connecticut Department of Transportation as a sub-contractor or owner-operator of construction equipment. The Bidder must indicate with their Bid the DBE firms(s) it intends to utilize to meet the above stated percentage and submit the Pre-Award DBE Commitment Approval Request with the bid forms. The Town of Ridgefield reserves the right to reject any or all bids; or to waive defects in same, if it deems such to be in the best interest of the Town. The Town of Ridgefield is an affirmative action, equal opportunity employer. The work to be done consists of the furnishing of all labor, materials, tools, and equipment necessary to construct the project as shown on the plans and as described in the specifications prepared by Tighe & Bond, Inc

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

56

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
269
Bidding Soon
4,222
All Active Projects
1,787
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2022

January 9, 2023

img_map_placeholder

Farmingville Rd, Ridgefield, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.