BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Crab Orchard, Kentucky. Completed plans call for site work for a pipeline.

**As of August 23, 2022, project was awarded to Delta Natural Gas Company, Inc, but awarded amount is not available.** The Lincoln County Fiscal Court is seeking proposals from Natural Gas Providers regulated by the Kentucky Public Service Commission to provide gas service to the US 150 corridor in Lincoln and Rockcastle Counties. The services area will be the US 150 Corridor from the intersection of KY 1770 and US 150 in Lincoln County to the KY 461 and US 150 Intersection in Rockcastle. The services area will then proceed along KY 461 and US 25 to Renfro Valley, and both industrial parks in Mt VernonThe gas provider should plan to provide adequate gas volume and pressure to support the current demand and a large Regional Industrial Park using a 75-year projection of needs, and be prepared to meet the following:Construction and operation of a .322 w.t. 8" steel natural gas pipeline that would serve the communities of Crab Orchard, Brodhead, Mt. Vernon, the I-75 interchange commercial/industrial area, and Renfro ValleyThe offeror is responsible for land acquisition, designing, engineering, constructing, and operating the pipeline and all appurtenant facilities, including but not limited to, a tap, meter station, odorizer equipment and preheater equipment. By December 31, 2022, the offeror must own a constructed and operational natural gas tap and meter facility to which pipeline and hazardous materials safety administration and kentucky public service commission rules and regulations o Pipeline construction activities should begin no later than January 2023, subject to approval of the Kentucky Public Service Commission and any other administrative or judicial tribunal with jurisdiction.he Lincoln County Fiscal Court reserves the right to reject any and all proposals.

Award

Pipeline

$425,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
24
Bidding Soon
660
All Active Projects
263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2022

September 8, 2022

img_map_placeholder

US-150 & KY-1770, Crab Orchard, KY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.