Remodeling and renovation of an educational facility in Manchester, Iowa. Completed plans call for the renovation of a educational facility; and for the remodel of a educational facility.
The project consists of Building Improvements and Remodel of the High School and other related Work indicated in the Drawings and Specifications. Project location is at the 605 New Street, Man-chester, Iowa. A more detailed description of the kinds and approximate quantities of materials and types of construction for which bids will be received are set forth in the Bidding Documents prepared by SiteloglQ, which, together with the proposed form of contract, have heretofore been tentatively approved by the Board of Directors of the West Delaware Community School District, subject to public hearing, and are now on file for public examination at the District's Administration Office located at 701 New Street, Manchester, Iowa, and are by this reference made part hereof as though fully set out and incorporated herein. All sealed bids in connection therewith shall be submitted to the Board of Directors of the West Delaware Community School District on or before the time herein set for letting. All proposals shall be made on official proposal forms furnished by the Architect/Engineer and must be enclosed in a separate sealed envelope and plainly identified and addressed to the West Delaware Community School District. If a bid is to be mailed, the bid envelope shall be sealed in a regular mailing envelope. FAX and E-mail Bids will not be accepted. The Owner reserves the right to reject any or all bids and to waive informalities as allowed by law and to hold and consider the bids for 45 days after the date of the bid opening. The contract will be awarded to the lowest, responsive, responsible bidder. Each proposal shall be accompanied by a bid bond, certified check, cashier's check or certified share draft in a separate sealed envelope, clearly marked "Bid Bond" or Bid Security", in an amount equal to five percent (5%) of the total amount of the proposal. The certified or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America or the certified share draft shall be drawn on a credit union in Iowa or chartered under the laws of the United States and payable to the West Delaware Community School District. Said check or share draft may be cashed, or the bid bond forfeited as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days of issuance of a Notice of Award and post bond satisfactory to the School District insuring the faithful fulfillment of the contract and maintenance of said improvements as required by law. The bid bond should be executed by a corporation authorized to contract as a surety in the State of Iowa and must not contain any conditions either in the body or as an endorsement thereon. The successful bidder will be required to furnish performance and payment bonds in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Board of Directors of the West Delaware Community School District of Manchester, Iowa, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, the payment for labor and materials used in the project and the maintenance of said improvements in good repair for not less than one (1) year from the time of acceptance of said improvements by the Board of Directors of the West Delaware Community School District. Payment of the cost of said project will be made from such cash funds of the West Delaware Community School District as may be legally used for said purpose at the discretion of the West Delaware Community School District. The Contractor will be paid ninety-five per cent (95%) of the Architect's/Engineer's estimate of the value of acceptable work completed at the end of the preceding month. Final payment will be made not less than thirty-one (31) days after completion of the work and acceptance by the Board of Directors of the West Delaware Community School District, subject to the conditions of and in accordance with the provisions of Chapter 573 of the Code of Iowa. No such final payment will be due until the Contractor certifies to the Board of Directors of the West Dela-ware Community School District that the materials, labor, and services involved in the final estimate have been completed and paid for in accordance with the requirements stated in the specifications. The West Delaware Community School District of Manchester, Iowa is exempt from paying Sales and Use Tax and will supply Contractor with an "Iowa Sales Tax Exemption Certificate" and an authorization letter to allow the Contractor to buy equipment and material for the project without paying Sales and Use tax. The Work shall commence per the Bidding and Construction Schedule after receipt by the contractor of a written notice to proceed, and shall be completed in phases with substantial completion on the 2nd Day of December 2022, subject to any changes in the contract period as provided for in these specifications, and granted by the Board of Directors of the West Delaware Community School District. The Work shall be finally completed by, and ready for final payment, on or before the 30th day of December 2022, subject to any changes in the contract period as provided for in these specifications and granted by the Board of Directors of the West Delaware Community School District. By virtue of statutory authority, a preference will be given to products and provisions grown and coal pro-duced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the impo-sition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. All bidders shall provide a statement regarding the bidder's resident status. This statement shall be on the Bidder Status Form designated by the Iowa Department of Labor Commissioner and available on-line. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed non-responsive and rejected. Plans and specifications governing the construction of the proposed improvements have been prepared by the Architect/Engineer. These plans and specifications, and the proceedings of the Board of Directors of the West Delaware Community School District referring to and defining said improvements, are hereby made a part of this Notice and the proposed contract by reference, and the proposed contract shall be executed to comply therewith. Digital plans and specifications can be downloaded through SiteloglQ by contacting Jen Godina at 952-223-4411. All bids will be governed by applicable provisions in the Iowa Code and West Delaware Community School District, including its Non-Discrimination Equal Employment Opportunity and Affirmative Action Policy. Bid Results- 1. HS #1 General Construction - Tricon General Construction, Inc - $ 2,470,000 2. ESMS #1 General Construction - Tricon Construction - $ 7,280,000 3. #1A General Construction - Knutson Construction - $ 9,070,000 4. #3A Electrical - Hawkeye Electric - $ 4,154,265 5. HS #4 Temperature Controls - Trane Technologies - $ 609,079 6. ESMS #4 Temperature Controls - Trane Technologies - $ 621,900 7. #4A Temperature Controls - Trane Technologies - $ 1,154,043
Bid Results
Educational
$25,359,287.00
Public - County
Remodeling, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2022
September 9, 2022
605 N New St, Manchester, IA
Related To This Project
Manchester, IA
Bid Date: Mar 15 2022
Manchester, IA
Bid Date: Jan 12 2022
Manchester, IA
Bid Date: Mar 14 2022
Manchester, IA
Bid Date: May 12 2022
Manchester, IA
Bid Date: Jun 09 2022
Manchester, IA
Bid Date: Apr 27 2018
Manchester, IA
Bid Date: Jun 27 2019
Manchester, IA
Bid Date: Feb 08 2022
Manchester, IA
Bid Date: Nov 15 2022
Donnellson, IA
Bid Date: Apr 05 2023
Carroll, IA
Bid Date: Nov 15 2022
Newton, IA
Bid Date: Nov 04 2022
Woodbine, IA
Bid Date: Nov 29 2022
Logan, IA
Bid Date: Nov 16 2022
Johnston, IA
Bid Date: Sep 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.