BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Abilene, Texas. Completed plans call for the renovation of a transportation facility.

Goals for minority participation for each trade: 3.82% Goals for female participation in each trade: 6.9% Base bid scope of work includes the renovation of the lower-level restrooms and the refinishing and resurfacing of interior walls and ceilings of the Abilene Regional Airport. The restroom renovation shall include the removal of existing fixtures, and provision of new plumbing fixtures, countertops, and toilet partitions, in addition to other modifications included in the Drawings. The restrooms will also accommodate a new family restroom and Mothers nursing room. The refinishing and resurfacing includes an application of acoustical soundproofing to the existing exposed coffered concrete slab ceiling of both floor levels. Work additionally includes the cementitious plastering of existing exposed aggregate concrete finishes and the integral application of corner guards and wall base materials at the locations indicated. Alternate scope of work includes the refinishing and resurfacing of all non-grant funded areas indicated in to contract documents. A cashiers check, certified check, or acceptable bid bond, payable to the city of abilene, texas, in an amount not less than five (5) percent of the bid submitted, must accompany each bid to guarantee that, if awarded the contract, the bidder will, within 15 days after receiving notice of award, enter into a contract, provide an acceptable certificate of insurance, and execute bonds on the forms provided in the contract documents. Performance and payment bond information is found in the instructions to bidders. All bids must comply with specifications. All bids must remain open for 60 days after bid opening. Women will be afforded equal opportunity in all areas of employment. However, The employment of women shall not diminish the standards or requirements For the employment of minorities. For contracts of $50,000 or more, a contractor having 50 or more employees, And his subcontractors having 50 or more employees and who may be awarded a subcontract of $50,000 or more, will be required to maintain an affirmative Action program within 120 days of the commencement of the contract. Contact Person: (325) 676-6226 or purchasing@abilenetx.gov The contractor has not submitted a complete compliance report within 12 months preceding the date of award The city will award the contract to the lowest responsible bidder. The city reserves the right to reject any or all bids.

Award

Transportation Terminals

$2,704,500.00

Public - City

Renovation

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
146
All Active Projects
63
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

January 2, 2023

img_map_placeholder

2933 Airport Blvd, Abilene, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.