BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Dufur, Oregon. Contact the soliciting agency for additional information.

Award Details Contract Award Date: Sep 23, 2022 Contract Award Number: 12363N22C4025 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: MB4JG8DV9YH7 Contractor Awarded Address: Maupin, OR 97037-9100 USA Base and All Options Value (Total Contract Value): $745389.45 WHITE RIVER FIRE RECOVERY STEWARDSHIP IRSC - Region 06, Mt. Hood National Forest, Barlow Ranger District, Oregon Background: The White River Fire Recovery Stewardship IRSC shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. NAICS: 115310: Support Services for Forestry, size standard: 20.5M Fuels Management Services. Stewardship authorities permit the Government to solicit this requirement as Full and Open competition. Project Location: The project is located on the Barlow Ranger District of the Mt. Hood National Forest in Wasco County approximately 6 1/2 miles west of the unincorporated community of Pine Grove, Oregon. Legal description is Sections 13, 24, T. 4 S., R. 9 E.; Sections 19, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, T. 4S., R. 10 E.; Sections PB 45, PB 46, 29, 31, 32, T. 4 S., R. 11 E.; Sections 01, 02, 03, 04, 10, 11, 12, T. 5 S., R. 10 E.; Sections 05, 06, 07, 08, 17, 18, 19, 20, T. 5 S., R. 11 E.; W.M., Surveyed, Wasco County, Oregon. Period of Performance: All work shall be completed by October 31, 2024. Description of Work: The overall objective of this project is to facilitate ongoing fire recovery actives within the 2020 White River Fire area. Activities include performing essential maintenance of roads that were impacted by fire, mitigation of fire killed/damaged roadside fuel accumulation and site preparation for future reforestation. This will be done by accomplishing the following: Felling fire killed/damaged standing fuels. Removing Included Grn Bio CV. Piling residual fuels. Maintaining and reconstructing roads. Estimated Timber Volume and Species composition is as follows: SPECIES PRODUCT QUANTITY UNIT OF MEASURE All Coniferous Species Grn Bio CV 9,818.00 CCF Pre-Solicitation Site Visit Date and Time: Prior to solicitation, the Forest will hold a site visit for prospective contractors to facilitate dialogue on contractual requirements that are anticipated in the contract and any operational limitations foreseen by attendees. The site visit will be held on August 17, 2022, at 9:00 a.m. (Pacific Daylight Time) with a meeting location at the Barlow Ranger District Office (780 Court Street, Dufur, OR 97021). Send questions or interest to Andrew Tierney at andrew.tierney@usda.gov. Follow this notice on SAM for future notifications. It is anticipated that the Request for Quotes with all attachments shall be issued on or around August 12, 2022. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract. The method of contractor selection has not been determined at this time.

Award

Conservation and Development

$745,389.00

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
12
Bidding Soon
361
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

October 17, 2022

img_map_placeholder

780 Court St, Dufur, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.