Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Bedford, Quebec. Completed plans call for the renovation of a municipal facility.
Reference number : 1628436 Review Title : Renovation of the municipal office The work is divided into two sections, all according to the following detail. Demolition, preparation and repair work: a) Lower the ground level on the east side of the building . The asphalt must be removed and the soil dug in order to lower the ground level below the exterior cladding of the building by including new paving of the same area as currently, i.e. a length of 12 meters by a width of 3, 8 meters ensuring the necessary slope for water runoff outside the building. In addition, new stone and compaction should be provided if necessary. (photo 4.2 a - East wall of the building) b) Opening of the east wall of the building. The East wall of the building will have to be opened from the outside and/or from the inside in order to change the East door and the 3 windows of the same wall and the gypsum necessary following water infiltration. The East door must be of the same type, 34 inches with a window and a steel push bar. The windows will have to be pvc sliding with the same dimensions as the current openings approximately 46 inches by 32 inches. The front door and window will also have to be changed to the same dimensions. The 34 inch steel front door shall have a window and lock with a combination as at present and the window (53 inches by 51 inches) have openings for ventilation. The wooden structure of the windows and doors and the amounts around the windows are possibly rotten since there is water infiltration. It is therefore necessary to provide for the replacement of wood studs equivalent to twenty percent (20%) of the area of the east wall for the purposes of the bid. The actual amount for this item may be adjusted based on the actual amount replaced and according to article 4.6.(photo 4.2 b window surround) c) Insulation . Insulate the east wall along its length of 18 meters and its height with sprayed insulation. A new vapor barrier will be required. In addition, additional wood studs are to be expected since those currently in place are spaced approximately 22 inches apart. (photo 4.2 c - inside wall) d) Reinstall toilet piping inside the building . Currently, it passes through the exterior wall and there is freezing of the pipes in cold weather. It will be necessary to condemn the current pipes and to redo the piping inside with a formwork in the toilets. Finishing work : e) Change the two toilets for 2 low flow toilets. f) Change the two fans in the toilets with built-in light and reposition the convector. g) Repair and paint the walls of the hallway, boardroom, washrooms and DG office measuring 14 feet by 14 feet. The work must be completed before May 1 , 2023 . The contractor must ensure the accessibility and security of the offices during business hours. The contractor must provide all the normal services that are usually required for this type of project and follow the standards of the Building Act . award is subject to final approval.
Award
Municipal
$129,945.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2022
September 30, 2022
237 Route 202 E, Bedford, QC
Related To This Project
Bedford, QC
--
Bedford, QC
--
Bedford, QC
--
Bedford, QC
--
Bedford, QC
Bid Date: Mar 30 2023
Bedford, QC
Bid Date: Apr 26 2023
Bedford, QC
Bid Date: Apr 17 2023
Bedford, QC
Bid Date: May 25 2023
Bedford, QC
Bid Date: Jul 25 2022
Bedford, QC
Bid Date: Jun 28 2021
Bedford, QC
--
Bedford, QC
--
Bedford, QC
Bid Date: Feb 28 2022
Bedford, QC
Bid Date: May 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.