Site work and paving for a civil project in Birmingham, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The scope of work includes the reha- bilitation of approximately 2,869 lin- ear feet of 27-inch through 30-inch mainline via cured-in-place liner, 110 vertical feet of manhole rehabilitation, replacement of 93 linear feet of 27- inch existing pipe, asphalt paving and restoration work. Bidding Documents are on file for inspection, by appointment only, at the following location: Jefferson County Environmental Services Department 716 Richard Arrington Jr. Boulevard North, Suite A-300 Birmingham, Alabama 35203 Contact for Appointment: John Willett at: (205)325-3060 Bids will only be accepted from pre- qualified contractors who are listed on the Plan Holders List, signifying that they have purchased a set of docu- ments from the Engineer, and who attend the MANDATORY Pre-Bid Conference.No bid proposal shall be accepted after the time stated for receiving bid proposals in this notice. A form containing the con- tractor's name and address of the firm and the con- tractors alabama license number with the date of expiration is required with the submission of the bid. These requirements shall not be waived. The contractor is hereby advised that time is of the essence on this project. The Contract Time for this project is two hundred seventy (270) consecutive calendar days from the effective date of the written Notice to Proceed to achieve Final Acceptance. Liquidated damages will be assessed if this time limit is exceed- ed. The Contractor may apply for an extension of time in accordance with the provisions of the Contract; howev- er, such an extension must be approved prior to the Contract Completion Date to avoid the imposition of liquidated damages. If you are unable to join the call due to technical difficulties, call Tad Powell (Hazen and Sawyer) at (205)957-4151 or John Willett (Jefferson County) at (205)325-3060 for assistance. Questions concerning meaning or intent of Bidding Documents shall be submitted to Tad Powell, PE, Senior Associate, Hazen and Sawyer, at email tpowell@hazenandsawyer.com no later than 5:00 p.m. local time on AUGUST 19, 2022. All questions must be in writing on Bidders companys letter- head. The attention of all bid- ders is called to the provi- sions of the state law gov- erning general contrac- tors, as set forth in ala- bama code sections 34-8-1 through section 34-8-28 (1975), as amended, chapter 4, section 65 to 82 (inclusive) of title 46 of the code of alabama of 1940, as amended; and bidders shall be gov- erned by said law insofar as it is applicable. The above- mentioned provisions of the code make it illegal for the owner to consider a bid pro- posal from anyone who is not properly licensed under such code provisions. The attention of bidders is called to the provisions of alabama code section 39-2-14 (1975) as amended, requiring a nonresident contractor to register with the depart- ment of revenue prior to engaging in the perform- ance of a contract in the state of alabama. The attention of bidders is called to the provisions of alabama code section 39-3-5 (1975) as amended, regarding preference to resident con- tractors. The attention of bidders is called to the provisions of alabama act 2016-312 as amended, regarding not engaging in the boycott of a person or entity based in or doing business with a jurisdiction with which this state enjoys open trade. The excavation portion of this project is classified as a class "A" sewer line proj- ect. All prospective bidders must be pre-qualified with the jefferson county envi- ronmental services depart- ment to bid either class "A" sewer line projects or cured-in-place projects in order to bid on this project. To pre-qualify with the department to construct class "A" sewer line proj- ects or cured-in-place proj- ects, each prospective bid- der must furnish written evidence of competency and evidence of financial responsibility to the coun- ty. Accordingly, the county will not accept pre-qualifi- cations after August 12, 2022. liquidated damages the amount of $1,500.00 per day for each consecutive calendar day

Bid Results

Water / Sewer

$2,250,465.00

Public - County

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
545
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

November 14, 2022

img_map_placeholder

Multiple Locations, Birmingham, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.