BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Plant City, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Hillsborough Road Name: SR 39 (Alexander St) Limits: At Jl Redman Pkwy Project(s): 44073315201(*) Federal Aid No: D722040B Project(s): 44073315202 Federal Aid No: N/A Project(s): 44559815201 Federal Aid No: N/A Total Roadway Length: 0.537 Miles Contract Days: 225 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.537 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 120 Calendar Days The improvements under this contract consist of intersection improvements to SR 39 (Alexander St.). Additional work includes adding a right turn lane, widening existing turn lanes, resurfacing, new sidewalks, signing and pavement markings, and a new traffic signal. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 011 Intersection Improvement/Milling and Resurfacing/Lighting/Traffic Signals

Award

Roads / Highways

$3,304,021.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
174
Bidding Soon
2,522
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

September 9, 2022

Project location map

S Alexander St, Plant City, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.