Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Sainte-Anne-des-Monts, Quebec. Conceptual plans call for site work for a museum; and water / sewer project.
Exploramer, located on the wharf of Sainte-Anne-des-Monts in Gaspésie, is a museum-aquarium that currently houses twenty-five tanks presenting some sixty marine species of the St. thousand individuals. Open to the public since 1995, between June and October, it welcomes 30,000 visitors in season. Exploramer will soon begin a project to expand and develop its infrastructure. The work is aimed in particular at: Renewing the permanent exhibition and setting up an ecosystem aquarium; Construction of a St. Lawrence Shark Pavilion, that will include an aquarium of spiny dogfish and rays, and a digital show produced by Moment Factory. Creation of an entertainment area for children and families; Upgrading the current building and the exterior site; The production of two temporary museum exhibitions. The work will be divided into three separate sites: 1) the 1st site: the three basins (an ecosystem basin, a spiny dogfish and ray basin and a reserve basin) - Engineering only; 2) 2nd project: construction of the Shark Pavilion - Architecture and engineering; 3) Site for upgrading the museum (current building) - Architecture and engineering. The first site: Ecosystem basin Construction of an L-shaped basin inside the existing building; Dimensions indicated on the corresponding sketch; A glazed wall, the other walls in concrete or fiberglass; Reinforcement of the concrete floor slab; Replacement/widening of the drainage system; Staircase and handling platform at the back of the basin; Life support equipment (chiller, pump, filtration, UV sterilization, skimmer, lights); Connection of the basin to life support equipment and sea water intake; Upgrading of electricity, ventilation, etc. needs. Planning of needs related to the structure, ventilation and electricity in conjunction with the team of the 3rd construction site and with the museology team of Exploramer in order to align the work and needs. Spiny dogfish and ray pond; Construction of a semi-cylinder shaped aquarium in the new Shark Pavilion; Dimensions indicated on the corresponding sketch; A straight glazed wall (or two), the other walls in concrete covered with a non-abrasive Gelcoat; Installation of a drainage system to municipal sewers; Various structural works, including: Life support equipment (cooler, pump, filtration, UV sterilization, skimmer, lights); Connection of the basin to life support equipment and sea water intake; Diving staircase, folding or removable; Fiberglass grating platform above the main basin for access and maintenance; Planning of needs related to the structure, ventilation and electricity in conjunction with the team of the 2nd construction site and with the team of Moment Factory in order to align the work and needs. Storage tank for spiny dogfish and rays Construction of a storage tank, round, in concrete or fiberglass; Dimensions indicated on the corresponding sketch; Life support equipment (chiller, pump, filtration, UV sterilization, skimmer, lights); Connection of the basin to life support equipment and water intake at sea; Ladder and handling platform around and above the basin. Other elements to consider: An aquaculture systems specialist can support the team; The biologist responsible for the living collection and systems will be integrated into the site team. TIMELINE: Tender for a turnkey project of an ecosystem basin has been issued and can be followed in the report under ID name: Construction of an Ecosystem Basin. Further update in winter/spring, 2024.
Conceptual
Water / Sewer
$4,000,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2024
3 1re Avenue O, Sainte-Anne-des-Monts, QC
Related To This Project
Sainte-Anne-des-Monts, QC
Bid Date: Sep 08 2022
Rehabilitation Work on Runway 14-32 and Upgrading of Sainte-Anne-Des-Monts- Lot 02 Airport - 4305813
Sainte-Anne-des-Monts, QC
Bid Date: Apr 15 2021
Sainte-Anne-des-Monts, QC
--
Sainte-Anne-des-Monts, QC
Bid Date: Jun 29 2020
Sainte-Anne-des-Monts, QC
Bid Date: Sep 12 2018
Sainte-Anne-des-Monts, QC
Bid Date: Jun 30 2021
Sainte-Anne-des-Monts, QC
Bid Date: Apr 09 2021
Sainte-Anne-des-Monts, QC
--
Sainte-Anne-des-Monts, QC
--
Sainte-Anne-des-Monts, QC
--
Sainte-Anne-des-Monts, QC
Bid Date: Jul 07 2022
Sainte-Anne-des-Monts, QC
Bid Date: Aug 11 2022
Sainte-Anne-des-Monts, QC
Bid Date: Jul 11 2022
Sainte-Anne-des-Monts, QC
--
Sainte-Anne-des-Monts, QC
Bid Date: Jul 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.