Renovation of a detention facility in Concord, New Hampshire. Completed plans call for the renovation of a detention facility.

Replace Steam Lines and Traps Description: Work to include but not be limited to: Remove existing steam lines, traps and valves. Replace with new steam lines, traps and valves. The Project will include the Discipline(s) of: Mechanical and Electrical. Bidders Should Act Promptly and Submit All Questions in Writing to David W. Goulet, Fax 603/271-3515, E-mail David.goulet@das.nh.gov in Accordance With "explanation to Bidders". Security Clearances Are Required for Each Person Attending the Pre-bid Conference. Background Check Form Attached to Specification Section 000250 Must Be Submitted to the Department of Corrections Jason.m.newton@doc.nh.goyv and Heidi.h.laramie@doc.nh.gov for Each Person Attending at Least 3 Days Prior to Walkthrough. Approval is Not Guaranteed. Those Not Approved Will Not Be Allowed to Enter the Secure Facility. Approved Persons Will Be Notified. No Notification Indicates No Approval. A bid bond shall be submitted electronically at the time of bid in the amount listed below, payable to, 3 Treasurer, State of New Hampshire, as security for the execution of the contract. e All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified. Companies, Corporations or Trade Names, Except Sole Proprietorships Must Be Registered With the Secretary of E State (Corporate Division, Telephone No. 603/271-3244) in Order to Do Business With the State of New Hampshire. Bidders are advised that final bid award, as approved by Governor and Executive Council, and issuance of a notification to proceed with the work, can occur up to 60 days or more after the bid opening date. Per section 00204.18.2, Low Bidder has 20 days after notice of award to submit signed Contract, Certificate of Insurance, and Disadvantage Business Enterprise forms, if required. Bidders must submit a 5% bid security at Bid and must furnish a 100% payment and performance security prior to execution of contract. The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Concord

Bid Results

Jails / Prisons

$3,350,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Pest Control Devices, Scales
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Compaction, Earthwork Methods, Soil Treatment, Rodent Control
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
117
Bidding Soon
2,257
All Active Projects
933
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

October 31, 2022

img_map_placeholder

281 N State St, Concord, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.