BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2022 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a mixed-use development in Torrington, Connecticut. Completed plans call for the construction of a 309,000-square-foot, four-story above grade educational facility; for site work for a educational facility; office development; and playground / park / athletic field.

Construction of a new 309,000 SF four-story structure with a lower level. The building is constructed with typical spread footing and stem wall concrete construction with a concrete slab on grade over the aggregate pier reinforced soil. The structure is structural steel, fireproofed, with CFMF and CMU back up wall structure covered with brick veneer and various metal panel materials. The structure has radial and canted structural framing and includes large curtainwall, storefront, and punched windows, and a TPO roof to complete the building envelope. All new utility services will provide electrical, gas, water, sanitary services from the street to the building. The new building and all adjacent site improvements for parking and drive access will be constructed beginning in October of 2022. The High School and Middle School/High School Performing Arts and Kitchen will be complete for occupancy in February 2025. The Middle School Academic Wing and existing Gym renovation will be completed for the FF&E installation in June 2025. Following the abatement and renovation of the Gym, the remaining existing building will be decommissioned, abated, and demolished making way for the construction of one additional parking area and the new ball fields. Final site work will extend to the end December 2025. Addresses include 50 Major Besse Drive and 277 Winthrop Street. For questions regarding Addenda, or to confirm the bid date, contact Mark Carroll at O&G Industries, Inc. (860) 496-4233 or email markcarroll@ogind.com. *Please note that the estimated value reflects the entire scope of work.

Bid Results

Educational

$4,795,000.00

Public - City

New Construction, Site Work

1227

44

581

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
790
Active Projects
417
Bidding Soon
6,062
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 7, 2022

Project location map

50 Major Besse Dr, Torrington, CT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.