EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 10, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Medina, Ohio. Completed plans call for site work for a playground / park / athletic field; and sidewalk / parking lot.

Contractors are hereby invited to submit a Bid for a project in Montville Township to install hard surface on the pathways in the Cobblestone Park. All Pre-Bid Questions should be submitted in writing to the DPS via email. DPS will provide a response to all questions submitted before a deadline of 4:00 PM, October 4, 2022. Responses to Pre-Bid Questions will be provided by Addendum, a copy of which will be emailed or faxed to each person receiving a set of Contract Documents. DPS is not obligated to respond to, or otherwise act upon, a Pre-Bid Question submitted after this deadline, but reserves the right to act upon any information received. The Board of Commissioners of Medina County (Commissioners) and Montville Township reserve the right to reject any/or all Bids, and to waive any informalities or irregularities, and/or accept the Bid deemed the lowest and the best. Bidders must comply with Davis-Bacon and Related Acts (Federal prevailing wage). Saw cutting: The contactor shall saw cut the concrete pathway in 8' X 8' blocks to match the existing pathway. CAD data: The CAD data will be made available to the awarded bidder. The data will be delivered in 2018 Civil 3D drawing format.Stone excavation: Stone must be excavated to allow the concrete to be level and flush with existing pathway. Excess stone and topsoil are to be stockpiled in a location to be determined by Montville Township. Temporary fencing: Temporary fencing shall be located where new concrete meets the existing pathway as shown on Sheet 2. Snow fencing is acceptable. Concrete washout: A dumpster is acceptable as a concrete washout as long as it is watertight. Construction survey work: All construction survey work is the responsibility of the contractor.

Post-Bid

Playgrounds / Parks / Athletic Fields

$94,082.00

Public - County

Site Work

33

16

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting, Planting Preparation, Mulching, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
68
Bidding Soon
1,165
All Active Projects
439
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

November 11, 2022

img_map_placeholder

4765 Cobblestone Dr, Medina, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cobblestone Park, Phase 2 Multi-Purpose Trail Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.