Demolition, site work, paving and renovation of a mixed-use development in Eielson AFB, Alaska. Completed plans call for the renovation of a military facility; for paving for a sidewalk / parking lot; for site work for a sidewalk / parking lot; water / sewer project; and for the demolition of a military facility.

Contract Award Date: Sep 28, 2023 Contract Award Number: FA500423C0017 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: RVE7GUNB8G57 Contractor Awarded Name: AMES 1, LLC Contractor Awarded Address: Anchorage, AK 99501 USA Base and All Options Value (Total Contract Value): $7,177,346.00 Amendment 07 - The purpose of this amendment is to extend the response time from 15 March 23 to 31 March 23 1400 AKDT in order to allow ample time for review of the Questions and Answers (Q&A). Additionally, part two of the submitted bidder questions in regards to this project will be posted. A separate amendment will be issued to provide the additional Q&A documents, along with any applicable additional supporting documentationSol No : FTQW18-0204, FTQW_18_0204_Presolicitation_Notice The work includes work on multiple facilities in support of the F35 beddown at Eielson AFB. Work primarily occurs in Building 1324, Munitions Inspection Facility but additional work occurs in nearby facilities and utilidor. Work in adjacent buildings includes building demolition, heating system improvements, installation of water line recirculation system, and paving. Work in Building 1324 includes reconfiguration of the interior to divide the single bay into two separate bays and to construct an interior administrative area. Additional work includes construction of a fire suppression system, roof replacement, improvements and certification of the Lightning Protection System, and incidental related work. The magnitude for this requirement IAW FAR 36.204(g) is between $1,000,000.00 and $5,000,000.00. The work includes work on multiple facilities in support of the F35 beddown at Eielson AFB. Work primarily occurs in Building 1324, Munitions Inspection Facility but additional work occurs in nearby facilities and utilidor. Work in adjacent buildings includes building demolition, heating system improvements, installation of water line recirculation system, and paving. Work in Building 1324 includes reconfiguration of the interior to divide the single bay into two separate bays and to construct an interior administrative area. Additional work includes construction of a fire suppression system, roof replacement, improvements and certification of the Lightning Protection System, and incidental related work. The magnitude for this requirement IAW FAR 36.204(g) is between $1,000,000.00 and $5,000,000.00. Amendment 0001 - Change FAR 52.236-27 Amendment 0002 - The purpose of this amendmnet is to: 1). Extend due date of bids until 7 February 2023 at 1400. 2). Extend question due date until 18 January 2023 at 1400. 3). Change the Period of Performance from 365 days to 727 days. 4). Add Attachment 7- Anticipated Schedule in Accordance with Specification 01 14 00 Section 1.4. 5). Update FAR 52.211-10 and FAR 52.225-9 6). Update delivery and inspection in section F from 365 calendar days to 727 calendar days. 7). Add attachment 3 - Construction Final Drawings (11x17) (Specifications_Drawings) Amendment 0003 - The Purpose of this amendment is to: 1). Extend due date of bids until 7 February 2023 at 1400. 2). Extend question due date until 18 January 2023 at 1400. 3). Add photos of the mechanical room. Amendment 04 - The purpose of this amendment is to: 1).Extend the response time from 7 Feb 23 to 28 Feb 23 in order to allow ample time for review of the Questions and Answers (Q&A). A separate amendment will be issued to provide the Q&A document, along with any applicable additional supporting documents. **Note when submitting your bids please ensure the solicitation as well as all of the amendments are signed, if there are any questions please reach out.** *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions will be answered in the form of an amendment to the solicitation and posted to the SAM.gov website. All questions must be emailed to both emails above. No questions will be taken over the phone. We will allow additional questions in regards to the mechanical room only until 1 March 23 14:00L.

Award

Military

$7,177,346.00

Public - Federal

Demolition, Paving, Renovation, Site Work

1

33

100

9

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
11
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

June 16, 2023

img_map_placeholder

To Be Determined, Eielson AFB, AK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.