Renovation of a military facility in Washington Na, District of Columbia. Completed plans call for the renovation of a military facility.
All terms and conditions of N4008020D0011/0012/0013/0014/0015/0016 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issues, please contact Madison Moran at rumi.a.monsur.civ@us.navy.mil. Amendments will be posted directly to www.sam.gov. NAVFAC Solicitation No.: N40080-20-R-0007 ACQR# 5937664 NAVFAC Scope of Work: Work Order No. 1705221 Title: WNY -201 NAVSEA TANC Upgrade & Divide Room 4W334 Location of the Work: Washington Navy Yard (WNY), Washington, DC Description of the Work: The work includes the following and incidental related work. The Contractor shall provide all approved materials, labor, equipment, tools, mobilization, transportation, supervision, and any other incidental work and accessories to accomplish work as described herein. The Contractor is required to inspect, clean, repair and test as needed any work for full operation to the requirements and specifications as detailed in the scope of work dated March 09, 2022. Estimated Price Range: In accordance with FAR 36.204 Disclosure of the magnitude of construction projects, the estimated price range is between $500,000 and $1,000,000. Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the duration of this task order shall be 120 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number DC20220002 07/29/2022 applies to this work (Attachment A). The wage determination version in effect at the time of award shall apply to the work performed under this contract. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $99.42 for each calendar day of delay until the work is completed or accepted. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are required. Government Furnished Property: Not included. Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible Offeror, offering the best value to the Government. For this task order, to make a determination of best value, the Government shall evaluate each Offeror on Price Only and the Basis for Award will be "Lowest Price. Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each Offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. The Offeror shall submit an electronic copy with the price proposal form and a hard copy of your bid bond must be submitted to the address listed in the title above, within three (3) days after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award. Proposal Acceptance Period: Proposal acceptance period shall be 90 days from receipt of offers. Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Rumi Monsur at rumi.a.monsur.civ@us.navy.mil no later than 14 days prior to the proposal due date. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment B). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. Responses will be published via amendments to www.sam.gov. Site Visit: August 04, 2022 at 11:00 AM (calendar invite to follow) All attendees must submit Form SECNAV 5512 (Attachment C) to Rumi Monsur at rumi.a.monsur.civ@us.navy.mil. Proposal Due Date: Tuesday, August 24, 2022 at 02:00PM Local Time. LATE PROPOSALS WILL NOT BE CONSIDERED. Proposal Delivery Information: OFFERORS SHALL SUBMIT electronic proposals (.pdf format) in response to this solicitation to Rumi Monsur rumi.a.monsur.civ@us.navy.mil In response to this request for proposal, the complete proposal shall include the Price Proposal in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$1,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 24, 2022
April 24, 2023
To Be Determined, Washington Na, DC
Related To This Project
Washington Na, DC
--
Washington Na, DC
Bid Date: Mar 21 2024
Washington Na, DC
Bid Date: Sep 12 2023
Washington Na, DC
--
Washington Na, DC
Bid Date: May 21 2021
Washington Na, DC
Bid Date: Apr 27 2021
Washington Na, DC
--
Washington Na, DC
--
Washington Na, DC
Bid Date: Aug 15 2019
Washington Na, DC
Bid Date: Nov 03 2022
Washington, DC
Bid Date: Aug 25 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.