Site work for a water / sewer project in Arcade, New York. Completed plans call for site work for a water / sewer project.
For information contact: Jacob Kelly, District Technician Wyoming County Soil and Water Conservation District 36 Center Street - Suite D, Warsaw, NY 14569 Phone: 585-786-3675 This project will involve the installation of approximately 120 linear feet of rock rip-rap streambank protection on the Cattaraugus Creek in the town of Arcade at the Raymond Milks Property on Route 98. This streambank stabilization project will include de- watering the project site, shaping and grading the channel and streambanks and armoring the streambank with heavy rock rip-rap. During construction, all appropriate erosion and sediment control practices will be implemented to minimize sediment pollution. To de-water the channel during construction, a coffer dam must be utilized. Material excavated during the channel re-shaping will be utilized on- site for streambank grading. To improve streambank stability, the banks will be re-graded to achieve a 2:1 (horizontal: vertical) slope. The banks of the channel will be cut back to achieve this slope, excess gravel will be used to slope the project where cuts are not necessary. The banks will be armored with heavy rock. Toe rock, consisting of 3 ft. by 3 ft. by 3 ft. single pieces will be entrenched into the streambed. Rock rip-rap will be placed along the bank at 2 feet of thickness and a vertical distance of ~8 feet above the toe. Pre-constructed trout habitat lunkers will be installed along 32 feet of the project (this area will be laid out prior to construction). Lunkers will be built on site by District staff and volunteers. The lunkers will be set on top of heavy gravel and with the bottom of the lunker at stream bed grade. The lunkers will be backfilled with gabion stone with large flat 2'x 2' rocks on the leading edge to weigh the structure down. Bank rock will be placed above the lunker to stabilize the remaining area. At the upstream and downstream ends of the project, a 15 foot key into the streambank will be installed consisting of heavy rock rip- rap. A grade control structure will be placed at the lower extent of the project and will be constructed using 3'x3' rock. The project must be completed by October 15th, 2022. A NYS DOT highway work permit and traffic control are required for this project. All work shall be completed with minimal damage to private property. After construction is complete, all disturbed areas will be seeded and mulched and will be restored to their before- construction conditions. This Proposal is a Lump Sum Proposal, with the contractor providing all the necessary equipment and labor to complete the work as outlined at the project site. Bid price shall include mobilization and required insurance costs.
Award
Water / Sewer
$42,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2022
September 12, 2022
7298 NY-98, Arcade, NY
Related To This Project
Arcade, NY
--
Arcade, NY
Bid Date: Jun 15 2021
Arcade, NY
Bid Date: Mar 09 2023
Arcade, NY
--
Arcade, NY
Bid Date: Mar 19 2020
Arcade, NY
Bid Date: Jan 10 2022
Arcade, NY
Bid Date: Mar 22 2024
Arcade, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
Staten Island, NY
--
Schenectady, NY
Bid Date: Aug 23 2022
Thurman, NY
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.