Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Flower Mound, Texas. Completed plans call for site work for a water / sewer project.
All questions must be submitted in writing (no exceptions) to purchasing@flower-mound.com Questions will not be answered over the phone by the Engineer and/or Engineering Design Firm. Location to Submit Responses: Town of Flower Mound, Attn: Sabrina Zadow, Purchasing Manager, 2121 Cross Timbers Road, Flower Mound, TX 75028. The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of approximately 6400 linear feet of sewer line replacement within Spring Meadow Lane, approximately 4100 linear feet of water line replacement within Spring Meadow Ln., Sweetgum Ct., Pepperwood Dr. and White Oak Ct. and associated appurtenances detailed in the construction plans and specifications. A Bid Bond in the form of a cashier's check, a certified check, or an acceptable bidder's bond made payable without conditions to the "Town of Flower Mound, Texas" in an amount of not less than five percent (5%) of the total amount of the bid submitted, must accompany each bid as a guarantee that if awarded the contract, the bidder will promptly enter into a contract and execute such bonds as are required and provide evidence of all required insurance coverage. All bidders' security will be retained until a contract has been awarded and executed. Each bidder shall carefully examine the Plans, Specifications, and other Contract Documents, shall visit the site and fully inform himself of all conditions affecting the work or the cost thereof, and shall be presumed to have done so and his bid shall be based upon his own conclusions from such examination. Each bidder shall carefully read the Notice To Bidders and Instructions To Bidders in the attached bid document for additional information, bonding and insurance requirements of awarded bidder. Questions Deadline: August 30, 2022 at 11:00am(CT)
Award
Water / Sewer
$2,609,265.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2022
November 7, 2022
Multiple Locations, Flower Mound, TX
Related To This Project
Flower Mound, TX
--
Flower Mound, TX
Bid Date: Sep 02 2021
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
Bid Date: Nov 10 2022
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Leander, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.