EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the renovation of a educational facility.

Project was awarded to: Property Solutions for $2,175,976, Poblocki Paving Corp. for $2,768,802 and Eddy's Landscaping for $833,000. 2023 Green Infrastructure Upgrades CH5 - Various MPS Sites All contractor(s) and subcontractors(s) are subject to the current livable wage rate, in accordance with the City of Milwaukee Ordinance 310-13. Per 2015 WI Act 55, prevailing wage rate laws have been repealed for all MPS Construction Projects beginning January 1, 2017. Bid Guaranty to Accompany Bid: MPS Bid Bond, Certified or Cashier's Check: 10% of Contractor's Base Bid. 2023 Green Infrastructure Upgrades CH5: Divisions 1 through 5 AT: DIVISION 1 Milwaukee German Immersion Elementary School 3778 N. 82nd Street Milwaukee, WI 53222 MPS Property #146 MPS Project #7331 DIVISION 2 Frederick J Gaenslen K-8 School 1250 E. Burleigh Street Milwaukee, WI 53212 MPS Property #185 MPS Project #8176 DIVISION 3 Alexander Mitchell Elementary School 1728 S. 23rd Street Milwaukee, WI 53204 MPS Property #274 MPS Project #8174 DIVISION 4 James Whitcomb Riley Elementary School 2424 S. 4th Street Milwaukee, WI 53207 MPS Property #313 MPS Project #8175 DIVISION 5 Richard Kluge Elementary School 5760 N. 67th Street Milwaukee, WI 53218 MPS Property #337 MPS Project #7429 MPS HUB, COIN and Student Employment / Participation requirements for each Division are identified on the Project Manual Cover and Bid Form and defined within the Contract Compliance Services Participation Plan Requirements in the Project Manual. The bidding documents may be viewed and downloaded for free from A/E Graphics On-line Plan Room, at website. All questions should be submitted in writing prior to 12:00 PM on Tuesday, February 14, 2023 to DFMSProcurement@milwaukee.k12.wi.us. No questions may be answered after that date and time. No questions shall be answered verbally. No verbal information from any source is to be relied upon by any respondent in the development of their Bid. Written questions and responses will be documented by way of addenda, which will be forwarded to all bidders. Each bid shall be for a fixed lump sum. Bids shall be submitted on-line through A/E Graphics On-line Plan Room, at website using the "Submit Bid" tab on the 2023 Green Infrastructure Upgrades CH5 - Various Sites project information page from which bid documents were obtained. Submit bid forms per Instructions to Bidders, Article B-5 of the Specifications. The right is reserved to reject any or all bids or to waive informalities. Upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals at the bid opening through sign language interpreters or other auxiliary aids. Division 1 - Milwaukee German Immersion Elementary School - Property Solutions - $1,233,455.90 Division 2 - Frederick J. Gaenslen K-8 School - Poblocki Paving - $1,031,587.00 Division 3 - Alexander Mitchell Elementary School - Property Solutions - $942,521.00 Division 4 - James Whitcomb Riley Elementary School - Eddy's Landscaping - $833,000.00 Division 5 - Richard Kluge Elementary School - Poblocki Paving - $1,737,215.00

Award

Educational

$5,777,778.00

Public - City

Renovation

123

18

4

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Glazed Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Facility Electrical Power Generating and Storing Equipment, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Unit Paving, Aggregate Surfacing, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Boring Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
87
Bidding Soon
1,501
All Active Projects
588
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2023

June 20, 2023

img_map_placeholder

Multiple Locations, Milwaukee, WI

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2023 Green Infrastructure Upgrades CH5 - Various Sites

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.