Published September 23, 2022 at 8:00 PM

Updated February 9, 2024

Demolition, site work, renovation and addition to a municipal facility in Mobile, Alabama. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the renovation of a 3,500-square-foot municipal facility; and for site work for a municipal facility.

The work consists principally of providing bonds, labor, materials, equipment, and supervision necessary for the renovation of a 3,500 SF office at the Alabama State Port Authority's Terminal Railway Operations Building in Mobile, Alabama. All areas of the ASPA Terminal Railway Operations Building are un-restricted access facilities. All Contractors submitting bids are to carefully examine the site of the proposed work and thoroughly review the contract requirements prior to submission of a bid proposal. Each Bidder shall satisfy oneself as to the character, quality, and quantities of work to be performed, and as to the requirements of the proposed Contract. The submission of a proposal shall be proof that the bidding Contractor has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of the proposed Contract. Electing to not visit the site before bidding will not relieve the prospective bidders from the stated requirements to "satisfy oneself as to the character, quality, and quantities of work to be performed, and as to the requirements of the proposed contract". All bidding Contractors must hold a current license from the State Licensing Board for General Contractors, Montgomery, Alabama with a classification being BC-Building Construction or BCU4: Building Construction under Four Stories. A Guarantee will be required with each bid as follows: (5%) percent of the amount bid, but in no event more than Ten Thousand ($10,000) Dollars, shall be furnished in the form of a certified check or bid bond payable to the Alabama State Port Authority. Performance and Payment bonds will be required at the signing of the contract in an amount not less than One Hundred (100%) percent of the contract price. No bid will be considered unless the bidder, whether resident or non-resident of Alabama, is properly qualified to submit a proposal for this work in accordance with all applicable laws of the State of Alabama. This shall include evidence of holding a current license as required from the State Licensing Board for General Contractors, Montgomery, Alabama. Also, non-residents of the State must show evidence of having qualified with the Secretary of State to do business in Alabama. Insofar as practical, the order of work will be as scheduled by the Contractor and approved by the ASPA Project Manager. The Contractor is required to submit a schedule detailing the sequence of work and time frame for Contractor's activities within 10 calendar days of receipt of the Notice to Proceed. Contractor's attention is directed to the fact that the facility's cargo handling operation is a priority item, therefore, close coordination with Terminal Railway Operations and the project manager is required. All work shall be according to these specifications and all reference documents. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Municipal

$1,500,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

43

11

19

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Timber Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Sodding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
40
Bidding Soon
541
All Active Projects
228
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

November 7, 2022

img_map_placeholder

126 Industrial Canal Rd, Mobile, AL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.