Published September 29, 2022 at 8:00 PM

Updated September 15, 2023

Site work, remodeling and renovation of a military facility in Joint Base Pearl Hbr Hickam, Hawaii. Completed plans call for the remodel of a military facility.

This Government Design-Bid-Build Task Order includes removal and disposal of existing UPS3 draw out switchgear and Uninterruptible Power Supply (UPS3) from UPS3 Electrical Room located in Building 5 (B5). Furnish and install new UPS3 draw out switchgear, pull boxes, conduit, conductors and appurtenances to make a complete and functional system. The project duration is TBD to be after award. The project is Prevailing Wage. Government is requiring contractors to hold price till 12/31/22. Trades required: Temporary Facilities (Office & Storage Trailer, Portable Restrooms, Fencing), Demolition, Concrete, Rebar, Mechanical & Electrical. *Amendment #1 has been issued for this project. Highlights from this amendment are: Period of Performance Extended to 951 days. RFI Responses. *Site Visit Photos have been released.

Award

Military

$3,000,000.00

Public - Federal

Remodeling, Renovation, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Project Identification, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
4
Bidding Soon
107
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2022

November 8, 2022

img_map_placeholder

400 Marshall Rd, Joint Base Pearl Hbr Hickam, HI

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Replace UPS3 Switchgear

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.