BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Suches, Georgia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of June 5, 2023, notice to proceed has been issued and construction is underway, however, an exact timeline for construction has not been confirmed. 0.258 Mile of Construction of a Bridge and Approaches on Sr 60 Over Suches Creek Counties: Union District 1 - Gainesville, Area Office 4 - Cleveland All Questions and Comments Must Be Submitted by the Close of Business of the Friday Two Weeks Before the Letting. All Questions and Comments Received After the Friday Before the Week of the Letting Will Be Documented, but a Response Will Not Be Provided. For Those Contractors Who Are Currently Prequalified as a Gdot Construction Prequalified Contractor or Registered Subcontractor Through Gdot's Construction Bidding Administration Office, and Want to Be Prequalified to Perform Maintenance Projects Under the Routine Maintenance Services Program, There is Now a Modified Prime Contractors Application Form Available. W E Welcome You to Participate. The Application Form and All Applicable Documents, Resources and Other Guidance May Be Found on the Gdot Website. Proposals Shall Only Be Submitted Electronically as Specified in the Specifications; and Shall Be Accompanied by a Proposal Guaranty in the Indicated Amount in the Form of a Certified Check, Cashiers Check or Bid Bond on the Form Issued by the Department. Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. Questions or Comments Call (404) 631-1147 GADOT - 022 - Construction of a Bridge and Approaches on SR 60 Temporarily re-route 1/0 ACSR three phase 14.4kV electric line by setting one pole and reframing others. Then restoring line to original and removing temporary.Relocate single phase 4 ACSR 14.4kV electric line and pole.

Under Construction

Bridges / Tunnels

$4,386,254.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

223

6

8

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
10
Bidding Soon
1,342
All Active Projects
442
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2023

April 3, 2023

img_map_placeholder

GA-60, Suches, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.