BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2022 at 8:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Philadelphia, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

On behalf of the City of Philadelphia ("City"), the Philadelphia Redevelopment Authority ("PRA") is pleased to issue this Request for Proposals ("RFP") for qualified prime contractors (each, an "Applicant" and together, the "Applicants") for the Cobbs Creek Playground project located at 700 Cobbs Creek Parkway. This project is part of the City's Rebuilding Community Infrastructure Program ("Rebuild"). PRA will accept questions and requests for additional information directed in writing to RFP@phdc.phila.gov Questions, responses, and additional information will be posted on the PRA Website within 5 business days of this date. Question Deadline 08/11/2022 at 3:00 PM ET If construction is not underway within 180 calendar days of contract execution, projects will be subject to updated prevailing wage rates. The PRA is subject to the Pennsylvania Right to Know Law. Any information provided in your Response to this may be subject to disclosure to the public. Documents provided in response to this RFP may also be required to be disclosed by applicable law, subpoena, and/or court order. The Work coversthe construction of a new playground located at 700 Cobbs Creek Parkway, Philadelphia, PA 19143. Existing play equipment and site surface will be demolished. New construction includes play equipment, safety surface (cork and poured-in-place rubber), trees, site seating (tree stumps, logs and bench), turf grass, concrete walking paths, signage, trash receptacles, pedestrian lighting and security cameras. See drawings and specs for detailed information on alternates which include: - Misters and drinking fountain in lieu of some play equipment; - Asphalt walking path in lieu of concrete; - Poured-in-place rubber safety surface in lieu of cork. Construction contracts: 30-35% minority and 15-20% women

Award

Playgrounds / Parks / Athletic Fields

$1,374,700.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
847
Active Projects
429
Bidding Soon
6,028
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2022

September 26, 2022

Project location map

700 Cobbs Creek Pkwy, Philadelphia, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.