BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Philadelphia, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

On behalf of the City of Philadelphia ("City"), the Philadelphia Redevelopment Authority ("PRA") is pleased to issue this Request for Proposals ("RFP") for qualified prime contractors (each, an "Applicant" and together, the "Applicants") for the Cobbs Creek Playground project located at 700 Cobbs Creek Parkway. This project is part of the City's Rebuilding Community Infrastructure Program ("Rebuild"). PRA will accept questions and requests for additional information directed in writing to RFP@phdc.phila.gov Questions, responses, and additional information will be posted on the PRA Website within 5 business days of this date. Question Deadline 08/11/2022 at 3:00 PM ET If construction is not underway within 180 calendar days of contract execution, projects will be subject to updated prevailing wage rates. The PRA is subject to the Pennsylvania Right to Know Law. Any information provided in your Response to this may be subject to disclosure to the public. Documents provided in response to this RFP may also be required to be disclosed by applicable law, subpoena, and/or court order. The Work coversthe construction of a new playground located at 700 Cobbs Creek Parkway, Philadelphia, PA 19143. Existing play equipment and site surface will be demolished. New construction includes play equipment, safety surface (cork and poured-in-place rubber), trees, site seating (tree stumps, logs and bench), turf grass, concrete walking paths, signage, trash receptacles, pedestrian lighting and security cameras. See drawings and specs for detailed information on alternates which include: - Misters and drinking fountain in lieu of some play equipment; - Asphalt walking path in lieu of concrete; - Poured-in-place rubber safety surface in lieu of cork. Construction contracts: 30-35% minority and 15-20% women

Award

Playgrounds / Parks / Athletic Fields

$1,374,700.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
190
Bidding Soon
3,539
All Active Projects
1,687
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2022

September 26, 2022

img_map_placeholder

700 Cobbs Creek Pkwy, Philadelphia, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.